<br /> Infiltrator IM- and TW-Series Septic JANUARY2014
<br /> Tank General Installation Instructions �N F I LT RATO R�
<br /> � tanks
<br /> BEFORE YOU BEGIN points provided at each of the inlet and outlet ports according to the applicable
<br /> Infiltrator Systems'tanks must be installed according to state and/or local Inlet and Outlet Hole Locations section of this document.The inlet and outlet
<br /> regulations,which supersede the manufacturer's installation instructions. may be drilled on either the sides or ends of the tank,as required based on
<br /> If unsure of the installation requirements for a specific site,contact the health applicable codes and site conditions`
<br /> department or permitting authority.The IM-Series referred to in this document *Indiana,Kentucky,Oregon,West Virginia,and certain Florida and Texas
<br /> includes the IM-540,IM-1060,and IM-1530 tanks.The TW-Series includes the tanks are factory-drilled.
<br /> TW-1250 and TW-1500 tanks. 3.The gaskets supplied with the tank are compatible with Schedule 40 and SDR
<br /> AWARNING:IMPLOSIONS MAY CAUSE SERIOUS INJURY 35 pipe using a 5-inch-diameter(125 mm)hole saw with IM-Series tanks,and
<br /> Follow Infiltrator Systems Inc.vacuum test instructions a 5'/a-inch-diameter(133 mm)hole saw with TW-Series tanks.
<br /> 4.Install the rubber gaskets at the inlet and outlet.
<br /> ' " ' ' S.Using all four of the tank's integral lifting lugs,lower tank into excavation.
<br /> ❑Infiltrator tank ❑Shovel 6.Slide the inlet and outlet pipes'through the gaskets.Soapy lubricant may
<br /> be used to slide the pipe in.
<br /> ❑Access port lid(s)* ❑Level *For North Carolina,the inlet pipe shall be a straight pipe with no tee.
<br /> ❑10 screws per lid' ❑5-inch-diameter(125 mm) 7. Horizontally position the tee 1'/z inches(40 mm)from the access port rim,
<br /> ❑2 inlet/outlet gaskets hole saw(IM-Series only) allowing the tee to fit into the recess in the access port lid(see detail).
<br /> (included) ❑5.25-inch-diameter(133 mm) 8,Install lids and risers(see Installing Risers section)as necessary.Rotate lid
<br /> ❑Inlet/outlet tees` hole saw(TW-Series only) over access opening until it indexes to tank and drops into position.
<br /> ❑Tape measure ❑Util ity kn ife POSITON TEE 1 5"in(40 mm)
<br /> ❑PVC I Q lue with rimer ACGESSPORTRIM `FROMPORTRIM
<br /> ❑Pipe,risers,etc. P P 9 P
<br /> ❑Socket wrench `tee and lid inclusion varies by cnsKer
<br /> ❑EXCaV2YOf state/province ACCESS
<br /> OPENING
<br /> LID
<br /> INSTALLATION SITE SELECTION •^NK W^��— TANK WLETTEE
<br /> (IM-10605HOWN) INTERIOR (TYPICAL)
<br /> 1.Do not install the tank in vehicular traffic areas.The tank is designed for
<br /> non-traffic applications.
<br /> 2.The allowable soil cover depth is 6 to 48'inches(150 to 1,POO Illlll�. ��h540,IM-10fi0,ANDIA41530 55in(7,375mm)
<br /> '18-inch(450 mm)max,in Florida for Cat.3 IM-and TW-Series tanks; Tw+aso�,orw-,soo 5,���,,z,5 mm� �
<br /> 48-inch(1,200 mm)max,in Florida for Cat.4 IM-Series tanks;36-inch ;�i i`�`�i� � � � � ,,��:
<br /> (900 mm)max.in Massachusetts,New Hampshire,North Carolina,and Oregon.
<br /> 3.The tank shall not be installed where the subsurface water level outside the tank >` �µ�°°°�^� ( �
<br /> xcnanHEw i :
<br /> exceeds the height of the outlet pipe saddle.Follow Table 4 guidelines. ' � aEf��E
<br /> EXCAVATING AND PREPARING THE SITE . ,� 1 �
<br /> �
<br /> 1.Unless buoyancy control measures are required,the excavation width and �� �� T,, ����%'��'
<br /> length should be 18 to 36 inches(450 to 900 mm)larger than the tank on each ,,,,,,,,,,,,,,,� ,,,�,,,,,,�.��r,
<br /> side or sized as necessary to ensure proper backfill compaction,as outlined
<br /> in Steps 5-10 of"Backfilling the Tank"in this document.See Infiltrator IM- BACKFILLING THE TANK
<br /> and TW-Series Tank Buoyancy Control Guidance document,available online
<br /> at www.infiltratorsystems.com,for specific excavation requirements when Note:Infiltrator tanks do not require filling with water prior to backfill
<br /> installing buoyancy control measures. placement.Water filling and backfilling to the tank mid-height is required
<br /> 2.Excavation depth shall account for the height of tank(55 inches(1,375 mm) if the tank is left in either an open or backfilled excavation that may fill
<br /> for the IM-Series tanks and 51 inches(1,275 mm)for the TW-Series tanks). with water from rain or other sources.
<br /> Also account for 4 inches(100 mm)of bedding(if required)and cover depth 1.Backfill with suitable native soil(max.3-inch(75-mm)stone diameter).If native
<br /> (permissible cover depth is 0.5 to 4 feet(150 to 1,200 mm)of soil). soil is unsuitable,replace unsuitable fraction with suitable soil.If suitable soil is
<br /> Note:If the water level outside the tank exceeds the height of the outlet not locally available,contact Infiltrator Systems for assistance.
<br /> pipe saddle,tank structural integrity may be compromised.Follow 2.Suitable soil shall include soil textural classes defined in the United States
<br /> Table 4 guidelines. Department of Agriculture soil triangle.Suitable soil textural classes are based
<br /> 3.Inspect bottom of excavation to verify suitability of native soil for tank on the tank installation depth,as measured from finished grade to the top of
<br /> installation.Soils with large,protruding,or sharp stones or other similar objects tank.
<br /> that may damage the tank are not suitable. a)For a tank soil cover depth of 0.5 to 2.0 feet(150 to 600 mm),suitable soil
<br /> 4.The tank ma be installed either in suitable native soil(see Backfillin the Tank textures include:
<br /> Y l 9 100%CLAY KEv:
<br /> section)or a minimum 4-inch(100 mm)layer of well-graded granular soil having 0 u�s�;,a„e
<br /> particles less than 3 inches(75 mm)in diameter,or maximum 0.5-inch(13 mm) �s�nab�a
<br /> � �� Suitable it dllatant
<br /> diameter crushed stone.
<br /> 5.Create a uniform,compacted,level surface to ensure that the bottom of the ao p Arkansas only
<br /> For sites with greater than 50%native
<br /> tank is evenly supported.Verify that the installation surface is flat. o ��qY ao day soil,backfill sha�be sepUc gravel
<br /> c�.ia ee�ai
<br /> or similar angular stone,sized 1/2-inch
<br /> �nokeagemo�.en to1-1/2inches.
<br /> Surlace Runofl �
<br /> TanM BuAalOeptn V/���j�,
<br /> 6(15R mm)MinYrum %������.
<br /> ' ' ' <8'(1.319 mm)Minmum \
<br /> ��� Percen�CL�� 5o PercentSllT
<br /> /� Md10,MA-1080 nnE IIAISJO:SS In(13)5 mm) v,�yT SAN C y
<br /> 1NL1250NnJ1NF1500'.511n(1.2i5mm) �✓.���
<br /> FI�aBeUEinBaVth(RFeyuireEl %�� �V
<br /> y�yj � � .'.�A 51 T LAV
<br /> ConpscteE SuileNe Ne�rve So1 or � LOAM
<br /> GnnubiMero�41 � , SAN CLA
<br /> mu DapIF Varles by
<br /> i i i?'�i\i�i ''i'�i'ii"i?�l�\'i i i i<>'ii�T'"�T'"�?�\�\/i,�i� ,�,o';;"zro'i::�a p �an�
<br /> ���T�/����\��\l�\�\�\��//Y���/`�i\�������\\1' SAe Selenbn nbore. LOAM
<br /> � W
<br /> INSTALLING THE TANK �� ""°"`°"" S��
<br /> . . �,_ �.�..
<br /> 1.Inspect the tank for damage before installation. �°°�S^"o °AN $"" , ���s��T
<br /> 2.If the tank inlet and outlet penetrations are not drilled,drill holes using the drill e��_�,������� ,�,. ,o,�