My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P02010 - new septic system
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
380 Big Island - PID: 23-117-23-32-0058
>
38 Unasssigned
>
Permits/Inspections
>
2000-P02010 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:47 AM
Creation date
4/18/2016 1:33:39 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' �Qo2o �v <br /> CITY OF ORONO SIEPTIC SYSTEM PERMIT APPLICATION <br /> Box 66 (2750 Kelley Parkwav) <br /> Crystal Bay, MN 55323 <br /> JOB SITE ADDRESS: � g� ���% =l s����``� _— <br /> Occupancy Type: Residential � Commercial Other <br /> Permit Type: New or Replacement System, $100.00 � ��0. OJ <br /> Repair Existing System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name: �%�,� ���c- /f PhoneNumber: <br /> Mailing Address: 3 3'`' � /'���� .�s l�;--� City: 7ip: <br /> Contractor's Name: S'j�� _ ����:,. � PhoneNumber: ��� -?S,S"'�-,3ii z— <br /> Mailing Address: C�f �:�� �/� �L-:i*�ic�-.�,-� City: 7ip: SJ�`�' <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24- <br /> hour notice is required for all inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.