Laserfiche WebLink
f � /� � ���� � <br /> CTTy OF ORONO SEPTICSI'S'I'E1�iPER1�-IITAPP'LICATION <br /> Box 66 (2750 Kelley Parkway) � <br /> Crystal Bay, I��T 55323 = <br /> JOB SITE ADDRESS: � `/(,� ��� 1-5���=��- <br /> Occupanc}• Type: Residential �_ Commercial Other <br /> Permit Ti�pe: I�'esv or Replacement System, $I00.00 /\ ' <br /> Repair Existing System, � $ <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees � <br /> *See fee schedule for non-residential permit fees <br /> O�vner's I�'ame: � J— � Phone\'umber: <br /> NTailinQ Address: � d �.� City: �6�o N�� �P� <br /> a � <br /> Contractor's I�'ame: ' ✓ r=X - Phonei�Tumher:�/�- �sS- J // �. <br /> 11�Iailing Address: �v. City:ud��rT�u•.- 7�p: S'S 3� <br /> DO \TOT 1�TALL PA'Yi�'IENT ti�ITH THIS APPLICATIO\T <br /> GE\rERA-L .�i'STRUCTIONS <br /> 1, Applications for septic system permits may be mailed or submitted in person at the Ciry <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must not be�in unless the permit card is on the job <br /> site. J <br /> 2, pennits will be issued only to contractors holdin� a City oi Orono Septic System <br /> Installers License. <br /> 3, All work must be done in accordance �vich the approved septic system desi�n. Desi�n <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover shee[ si�ned by the Ciry Inspector. <br /> 4, The followin� inspections will be required for all sep[ic systems: _ . <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to cover'ui�. <br /> C. Drainfield trench installation prior to coverin;. For mounds, inspection is required <br /> after rouah-up but prior to sand placemenc (sand will be jar tested for silt content), <br /> and a�ain durin� pressure distribution pipin� installation in the rock bed. <br /> D. Fi.nal inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5, Individual holdin�MPCA Tnstaller Certificate shall be present durin� inspections: A 2`�" <br /> hour notice is required for all inspections. <br />