Laserfiche WebLink
� � ' <br /> CITY OF ORONO SEP'TIC SYSTEM PERM�T APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay,Mn 55323 <br /> JOB SITE ADDRESS ZI 0 /��Z {� ��H � <br /> Occupancy Type: Residential�_ Commercial Othei� <br /> Permit Type: e`v or Replacement System $100.00 � �,� <br /> �air Existing System $ 50.00 <br /> (Tanks or Drainiieid) <br /> $0.50 State surcharge added to above fees -�- { � <br /> * See fee schedule for non-residential permit fees �� <br /> � <br /> Owner's l�Tame: Juc� C I�'1 G�,,,� I ��, Phone Number: <br /> Nlailing Address: Soc s��•�d �- ��-� City: ,��,,�_ Zip: 5S'YvZ <br /> Conti�actor's Name:�h�af� Cv c�. Phone Number: 7G s - ac�� Y�ii� <br /> Mailing Address: ���ys 7 1'vG ���c s f City: r ��� Zip: _��37 / <br /> x** DO NOT 1�IAIL PAY�IVI�i�13'Z'v'I'TH Ti�3S �PLI��.TIt3�`** <br /> GENERA,L INSTKUCTIONS <br /> l. Applications for septic system permits may be mailed or submitted in person at the City <br /> Off'ices; however, permits will not be mailed out. The permit must be picked up in person <br /> at the City Offices and work must not begin unless the permit card is on the j ob site. <br /> 2, Permits will be issued only to contractors holding a Minnesota Pollution Control <br /> A�ency(MPCA) Septic System Installers License. <br /> 3, All work must be done in accordance with the approved septic system desi�n. Desi�n reports <br /> are not considered approved unless accompanied by the "City of Orono Septic System <br /> Approval" cover sheet sijned by the City Inspector. <br /> 4. The followin� inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and jeneral contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> roujh up but prior to sand placement (sand will be jar tested for silt content), and ajain <br /> durin� pressure distribution pipinj installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (where required) components are n.inctional and coinply with codes. <br /> �. Individual holdina�1PCAInstallers License sha11 be present durin�all inspections. :�2�-�o�.�s• <br /> �aotice is rec�uired fop• a[1 inspections. <br />