Laserfiche WebLink
, <br /> , , <br /> � + w�n� <br /> ��� �* <br /> o �R �� �� CITY OF ORONO <br /> � � SEPTIC SYSTEM APPROVAL <br /> o��� o <br /> �����'}� CITY of ORO�TO <br /> M \:`� <br /> . ,�j� � �5�� ���-��" � MUIliCIp8IO�1CCS . <br /> �,� ! , ''�t'�'4d l ��� P06�Qtf'ICe BO%66 � <br /> � ''i` �!` '�r'�G Crystal Bay�Minnesota 55323-0066 <br /> �kESH�4 <br /> - LOCATION: I (�c� `3� b �S lArv� <br /> OWNER: (3 t lo S s tA-/�NJ '�I��:Ts C�A w�.� <br /> GENERAL CONTRACTOR: -- SEPTIC CONTRACTOR ���e P-�,K�,�s <br /> SITE EVALUATOR: S Q -1�3rz n+lo REPORT DATE: p c.-� �2, $�j <br /> The City of Orono has �-PP/l.�U ec9 your on-site system design as of 7-8 - S 9 <br /> (approved-disapproved) (date) <br /> widi die following conunents: <br /> THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF ORONO <br /> By �Y� <br /> Stephen ckman, On-site Systems Manager <br /> � TELEPIiONE-473-7357•FAX-473-0510 <br />