My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00133 - single family house
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Road
>
1220 Bracketts Point Road - PID: 11-117-23-32-0018
>
Permits/Inspections
>
2016-00133 - single family house
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:29:43 PM
Creation date
4/18/2016 9:23:03 AM
Metadata
Fields
Template:
x Address Old
House Number
1220
Street Name
Bracketts Point
Street Type
Road
Address
1220 Bracketts Point Road
Document Type
Permits/Inspections
PIN
1111723320018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Roger Peitso <br /> From: Roger Peitso <br /> Sent: Wednesday, March 23, 2016 5:20 PM <br /> To: 'pete@Welchforsman.com' <br /> Cc: Jeremy Barnhart; Christine Mattson <br /> Subject: 1220 Brackets Point Road <br /> Pete, <br /> Here are the details I talked to you about on the phone about today. <br /> 1. Provide details for the radon system and location of the sump basket(s) <br /> 2. FYI if any of the ductwork for heating the house is outside of the building envelope duct testing is <br /> required. <br /> 3. Provide specifications for the connectors for the cast stone pieces. <br /> 4. What codes is this building being constructed under, the structural plans reference the IBC. <br /> 5. Special inspections are being called out so; <br /> a. Who is doing the inspections? <br /> b. What is the inspection schedule? <br /> c. I will need copies of the inspection reports, field notes and final assessments. <br /> 6. All details show the weather barrier being terminated behind the flashing, the water resistive barrier is <br /> required to terminate on top of the flashing per the 2015 Minnesota Residential Code Sec. R703.7 <br /> 7. Will the 1" space between the brick and the sheathing be grouted full or not? <br /> 8. Will the ledger plate attached to the I-beams for the L5 X 5 X 3/8 for the brick ledge as shown 7/S6.2 be <br /> attached to the wood framing?Also what will be done at these similar locations for flashing and <br /> drainage? <br /> These are very elaborate plans and I have spent 4 or 5 hours getting familiar with them and I hope I have <br /> caught everything that might come into question. I will be reviewing these plans more tomorrow so I will be in <br /> contact you as soon as possible if I have any more questions. <br /> Sincerely, <br /> City of Orono <br /> Roger Peitso <br /> Building Official <br /> City of Orono <br /> Phone: 952-249-4600 <br /> Direct: 952-249-4625 <br /> Email: rpeitsoCa�ci.orono.mn.us <br /> Fax: 952-249-4616 <br /> :���� <br /> i 3 <br /> .. <br /> , �p � -� ; <br /> � � , <br /> �•,,c,r���.'���"�`. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.