Laserfiche WebLink
i:��-�� <br /> � <br /> CITY OF ORONO SEPTIC SYSTEi�i PERivIIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, N� 55323 <br /> � <br /> JOB SIT'E ADDRESS: � 5 3 S� �'� �� �.-.-!��� � <br /> Occupancy Type: Residential � Commercial Other <br /> Permit Type: New or Replacement System, $100.00 <br /> Repair Existing System, $ 50.00 J/ <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> , *See fee schedule for non-residential permit fees <br /> O�mer's I�'ame: PhoneNumber: <br /> � c�ty: - ' � - 4�--�s� <br /> 1�Iailing Address: — ' " _ <br /> Contractor's Name: <br /> � � Phone Number: �.��J - /�� 5 <br /> Nlailing Address• ���� City:�,�����-� �p�� -�.5 <br /> .� <br /> DO NOT I�IAII. PAY�IENT WTTH THIS APPLICATION <br /> GE\rERAL �i tSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holdin� a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Desi?n <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the City Inspector. <br /> 4. The followin; inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> afrer rouQh-up but prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain during pressure distribution pipin� installation in the rock bed. <br /> D. Fi.nal inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present durin; inspections: A 24- <br /> hour notice is required for all inspections. <br />