My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01087 - septic
Orono
>
Property Files
>
Street Address
>
C
>
Christine Drive
>
3535 Christine Drive - 05-117-23-12-0019
>
Septic
>
2014-01087 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:16:14 PM
Creation date
4/14/2016 2:55:04 PM
Metadata
Fields
Template:
x Address Old
House Number
3535
Street Name
Christine
Street Type
Drive
Address
3535 Christine Dr
Document Type
Septic
PIN
0511723120019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> OSTP Mound Materiats Worksheet UNIVERSITY �d <br /> Minnesota Pollution OF MINNESOTA `� <br /> Control Agency -���' <br /> ProjectlD: v 06.12.13 <br /> A.Calcutate Bed (rock)Volume:Bed Length (2.0 X Bed Width 2.6)X Depth =Vo(�me ft3 <br /> 63.0 ft X 10.0 ft X 1.0 = 630.0 ft' <br /> Divide ft'by 27 ft'/yd;to catculate cubic ards: <br /> 630.0 ft' � 27 = 23.3 yd' <br /> Add 20%for constructability: 23.3 yd'X 1.2 = 28.0 d� <br /> Y <br /> B. Calculate Clean Sond Volume: <br /> Volume Under Rock bed:Average Sand Depth x Media Width x Medio Length =cubic feet <br /> 13 ft X 10.0 ft X 63.0 ft = 829.5 ft3 <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upstope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> ft -1) X X ft = <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X X ft _ <br /> Total Clean Sand Volume:Votume from Length+Volume jrom Width+Volume Under Media <br /> . ft3 + ft' + fts = ft3 <br /> For a Mound on a slope greater than 1% <br /> Upslope Volume:((Upslope Mound Height - 1)x 3 x Bed Length)-�2=cubic feet <br /> (( 3.2 ft -1) X 3.0 ft X 63.0 )*Z= 204,8 ft' <br /> Downs(ope Volume:((Downs(ope Height-1) x Downstope Absorption Width x Medie Length)�2=cubic feet <br /> (( 3.5 ft-1) X 10.0 ft X 63.0 )+2= 777.p ft' <br /> Endslope Volume:(Downslope Mound iierght- 1)x 3 x Media Width =cubic feet <br /> ( 3.5 ft-1 ) X 3.0 ft X 10.0 ft = 74.0 ft; <br /> Tota!Clean Sand Vo(ume:Ups(ope Votume +Downslope Volume +Endsfope Volume +Volume Under Media <br /> 204.8 ft' + 777A ft' , 74.0 ft' + 829.5 ft'= 1885.3 ft' <br /> Divide ft'by 27 ft1/yd'to calcutate cubic yards: 1885.3 ft3 ; Z7 - bg.g yd; <br /> Add 20%for constructability: 69.8 yd'X 1.2 = g3,g yd3 <br /> C. Calculate Sandy Berm Vo(ume: <br /> Totat Berm Volume(approx):((Avg.Mound Height-0.5 ft topwit)x Mound Width x Mound Length)�2=cubic feet <br /> ( 3.3 _ 0.5 )ft X 37.0 ft X 85.0 )+2= 4429.2 ft' <br /> Total Mound Vo(ume-Clean Swd volume-Rock Volume=cubic feet <br /> 4429.2 ft' _ 1885.3 ft' _ 630.0 ft' - 1914.0 ft; <br /> Divide ft'by 27 ft3/yd'to catculate cubic yards: 1914.0 ft; = 27 - 70,9 yd3 <br /> Add 20%for constructability: 70.9 yd3 x 1.2 = g5,1 yd3 <br /> D. Calculate Topsoi!Alaterial Volume:Total Mound Width X Total Mound Length X.5 ft <br /> 37.0 ft X 85.0 ft X 0.5 ft = 1572.5 ft3 <br /> Divide ft'by 27 ft'/yd3 to calculate cubic yards: 1572.5 ft3 : 27 = 58,2 yd3 <br /> Add 20%for constructability: 58.2 yd3 x 1.2 = 6g,g yd' <br />
The URL can be used to link to this page
Your browser does not support the video tag.