My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01101 - new septic
Orono
>
Property Files
>
Street Address
>
C
>
Chippewa Lane
>
4360 Chippewa Lane - 31-118-23-42-0015
>
Septic
>
2012-01101 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:32:23 PM
Creation date
4/14/2016 1:40:54 PM
Metadata
Fields
Template:
x Address Old
House Number
4360
Street Name
Chippewa
Street Type
Lane
Address
4360 Chippewa Lane
Document Type
Septic
PIN
3111823420015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� UNIVERSxTY <br /> OF MINNESOTA �� <br /> OSTP Field Evaivation Form <br /> t.Contact Intormadon �� <br /> v 11.05.31 <br /> Property Ovmar/Clieni Cltent Phone Number. <br /> Address 4360 CMppewa Lane,Orono,NJJ 55359 <br /> Date 10/8/2012 Weather Condttions sunny�soils dry <br /> 2. Uqllty and StntcWre lnformallon <br /> Utllity locations Identifled �Gopher Stste One CaU p 7•800.252-1166 ❑�y P�ivate Utitltla <br /> Property Lines ❑Decermined and Approved By CBeM ClknYs Approva!(inttial) <br /> O Determined But Not Approved <br /> �Approximate <br /> ❑Properlylines Surveyed <br /> Locate and Verify�xe Sfte EvqluqHon map) <br /> EI��sa�e„i��s ❑�m�w�„�u O Eas��,s� p s��xs <br /> 3. Stte fnformation <br /> Percent Slope Stope Directfon <br /> Landscape PositEon shoulder Slope Shape Linear <br /> Veqetation tYPe(5) grass <br /> Evldence of cut,ffll,compacted or dfsturbed areas ❑Y� �� ❑Locate Areas on Stte Evaluatfon Map <br /> Dfscuss the ftooding or run-on potentfal of slte no flooding in proposed site location <br /> Identify benchmarks and elevations(Site Ew(uation Mcp)top of concrete on sidewaik in front of house <br /> Proposed soil tceatment area adequately protected 0 Yes CI No <br /> 4. Generai Soils tnfarmadon <br /> Original sofls �Y� �No <br /> Type of observatton ❑Sofi Probe QI Soil Borfng ❑Soil Pit <br /> Number oi soil oburvatians ❑3 <br /> Soil observationa were conducted in the proposed system taation �Yes �No <br /> A soii observatton was made withfn the most itmfting area of the proposed system �Y� �� <br /> Soii boring log fortns completed and attached �Y� ❑� <br /> Percolation tests perfortned,forms completed and attached ❑Yes �Nc <br /> 5. Phase I.Reporting Informatlon <br /> Depth to standing water na fnches Anttcipated construction issues <br /> Flood elevation rta feei <br /> Depih to bedrock �a Snches <br /> Depth to perfadicalty sawrated sofl 24 inches <br /> Maximum depth of system tt inches of sand fncAes top of rakbed is 96.9 <br /> Elevatlon at system bottam 94.9 Eeet Differences between soil survey and Netd evaluation <br /> Percolatfon ratc 30 min/inch <br /> Loading rate 0.5 gpd/ftl <br /> Contour loading rate 12 gpd/ft <br /> Sfte evaluallon issues/camments <br /> I hereby cetttty that I have completed this wwk in accordance with ' ble ordtnances,rules and laws. <br /> 2�'36`� �2. <br /> (Design�r) (5ignaturc) (�icense x� (oate) <br />
The URL can be used to link to this page
Your browser does not support the video tag.