� , <br /> , � <br /> ` . <br /> � �. FRAMING F`cgure 6. Reaz end wall <br /> ' From two treated 2x4's, cut two rim pre-built Frames Temporary <br /> �O�StS: bra e <br /> •143" for a 12' building <br /> •191" for a 16' building <br /> �239" for a 20' builcling <br /> Place the cut rim joists 12' apart fn <br /> the area selected for the barn <br /> location. Stand the front and back <br /> walls up at the proper ends of the run <br /> joists. Nail rim joists to the end wall <br /> frames using lOd nails. Temporarily <br /> brace each end. Stand the remaining <br /> frames up: <br /> •7 for a 12' building <br /> •9 for a 16' building <br /> •11 for a 20' building Temporary !yi �� <br /> Nail to rim joists as shown in Figure brace <br /> 6. Install a temporary brace across <br /> low roof inember. See Figure 6. ' F'ront end wall shown Rim Joist <br /> w/opt.T-1-11 siding <br /> 9. SQUARE THE BUILDING 11. FLOOR SHEATHING <br /> At base of building, �9ure 7. •12' Building:--From two 4'x8' sheets of floor <br /> measure across diagonally. �' � sheathing, cut three pieces 48" wide by 47-1/2" <br /> Adjust the building until long. Cut three 4'x8' sheets to 95-1/2" long. <br /> AC=BD. The building is •16' Building:--Cut su� 4'x8' sheets of floor <br /> then square. sheathing to 95-1/2" long. <br /> �20' Building:--From two 4'x8' sheets of floor <br /> 10. FLOOR SUPPORTS sheathing, cut three pieces 48"x47-1/2" long. <br /> Cut three 4'x8' sheets to 95-1/2" long. In <br /> From the remaining treated 2x4's, cut four addition to the cut pieces mentioned above, you <br />' 21-1/4" floor supports and the required will need three full, uncut 4'x8' sheets. <br />� amount of 22-1/2" floor supports,- <br />� • 8 for a 12' building r— <br />� •12 for a 16' building , Figure 9. <br /> •16 for a 20' building ; <br /> Install using lOd nails, at dimensions NOTE• (f�r step 11), Each <br /> . <br /> shown in Figure 8. iece m�J�� t be notched on <br /> '�"-'-"=7'-'-"'__"T-'_"--- <br /> sides to fit around� wali <br /> Fiure 8. Treated 2"x4"floor support Toe nail � <br /> 9 into Place at dlmensions shown frame members � QS Se�Irig <br />� ; _ , required. Stagger; end <br />' �� ; � '! ' joints front to ba.ck. � Nail <br /> 48° ' ` " ' ' in---- -e with 8d nails -- - <br /> t plac � 1------- <br /> every 8" dn center. <br /> � �Notches <br /> � � �48" � <br /> 12�°�� 12. SIDING SIDE WA�L <br /> •12' Building-Cut (6) 4'x8' sheets of siding to 71" long. <br /> 48" <br /> , �-�i�� •16' Building-Cut (8) 4'x8' sheets of siding to 71" long. <br /> � •20' Building-Cut (10) 4'x8' sheets of siding to 71" <br /> 1-1i2���{����•F-� � � long. Make certain end walls and frames are plumb <br /> � 2�-li4�z�-,i�� az-�ia�� z2-�i2•�2z-�iz�z�-�i4• (vertically level.) Then apply siding using 6d nails. <br />