My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
C
>
Chippewa Lane
>
4305 Chippewa Lane - 31-118-23-42-0011
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:32:18 PM
Creation date
4/13/2016 11:23:17 AM
Metadata
Fields
Template:
x Address Old
House Number
4305
Street Name
Chippewa
Street Type
Lane
Address
4305 Chippewa Lane
Document Type
Septic
PIN
3111823420011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Septic System Upgrade Deadline is Approaching <br /> Here's a friendly reminder to all Orono property owners with non-compliant onsite septic <br /> systeins. Beginning in the mid-1990s the City began to identify those septic systems that <br /> made use of trench drainfields, a majority of which do not maintain the minimum <br /> required vertical separation above seasonal water tables. Each existing system was <br /> subjected to soil borinbs to determine the seasonal water table depth. When a system was <br /> identified as non-coinpliant, the owner was notified of the need to bring the system into <br /> compliance and given several years to complete the upgrade. <br /> The deadlines to upgrade were divided into whether or not the property was in the <br /> Shoreland District (within 1000' of a lake, or within 300' of a protected tributary stream). <br /> Properties in the Shoreland District were given until December 31, 2007 to become <br /> compliant. Properties outside the Shoreland area with non-compliant systems were <br /> allowed until December 31, 2010 to conform to the septic code. <br /> Don't wait until the last minute! The City is strongly recommending that property <br /> owners not wait until the deadline arrives to bring their systems into compliance. The <br /> process to upgrade your septic system can be quite len�thy. The first step in the process <br /> is to hire a site evaluator & designer to determine what type of system is required and <br /> provide the blueprint for the system installation. The property owner must then contract <br /> with a septic system ir.staller to hav� the syste:n eonstructed. <br /> The installation of septic systems is very weather dependent, especially for mound <br /> systems, which can only be installed whei�the groi.uld is relatively �ry, i.e. typically June <br /> tlu•u September. Contractors' schedules fill up quickly, so it's important to start your <br /> planning and desi�n process now to ensure a timely installation. The period of time from <br /> decidin� to update your septic system to the actual installation can easily exceed three to <br /> four months or more. Please contact the Building and Zoning Department at (952-249- <br /> 4500) �a�ith any iL�estions yo�l may have about bringing your septic system into <br /> compliance. <br /> For a �is$ of licensed designers and installers yoaa may bo to w����ecIl.e��-o�n�.�a�.�n�, <br /> click on C'ity Departments, clic�: on Septic, then clic9: on the lini:ta <br /> ww�v.pca.state.mn.us/proerams. <br />
The URL can be used to link to this page
Your browser does not support the video tag.