Laserfiche WebLink
The total projected size of the forty-nine (49) tees is 65,000 square feet. The <br /> estimated cost to build the tees is $1.44 per square foot or $93,600. <br /> Bunkers <br /> The bunker count for the project is sixty-three (63). In addition to shaping and <br /> drainage (already covered), new high quality sand will be installed. The estimated sand <br /> needed for each bunker(average) is 30 cubic yazds, or 45 tons (6" of non-compacted white <br /> bunker sand, 1,600 sq.ft. ea�h bunker). At an estimated price of$50 per ton, the sand cost <br /> for each bunker would be $2,250 or $141,750 total. To haul the sand to the bunker <br /> locations and spread the sand in the bunker will cost approximately $500 per bunker or <br /> $31,500. Therefore, the total cost for the feature construction portion of the bunkers is <br /> estimated to be $173,250 <br /> Based on these line items, the total budget for feature construction (not including <br /> optional greens) is $266,850. <br /> IRRIGATION <br /> A qualified irrigation designer has not reviewed the Master Plan in detail. We have <br /> included an allowance of�40,000 for this project until an expert in irrigation design can <br /> review the current system and make a study of the course changes. <br /> CART PATHS <br /> There will be a need to install approximately 1,140 lineal feet of new 8-foot wide <br /> asphalt cart path. The estimated cost to core out a well, install 2 inches of asphalt over 4 <br /> inches of gravel, and finish the edges once the paths aze installed, is estimated to be $10 per <br /> lineal foot or $11,400. There will also be 350 lineal feet of curbing at $3.00 per lineal foot. <br /> The price for curbing is �1,050. The total cost for cart path and curbing is �12,450. <br /> There will also be 350 lineal feet of the old path that must be removed. The cost for <br /> this work is estimated to be $2 per lineal foot or $1,700. <br /> The total estimated cost for cart paths is $14,150. <br /> GRASSING <br /> Sod <br /> In order to get certain areas back in play as soon as possible sod should be used. It <br /> is anticipated that all areas will be sodded, including tees. Steeper slopes near bunkers or <br /> tees should also be sodded. The total estimated amount of sod needed is 220,000 square <br /> feet. The estimated cost is $.32 per square foot or $70,400 installed. <br /> Hydroseeding <br /> In places where sodding is not done, it is recommended that the area be <br /> hydroseeded. There will be approximately 3 acres of hydroseeded surface an estimated <br /> cost of$1,200 per acre for a total of$3,600. <br /> Therefore, the total estimated budget for grassing is $74,000 <br /> 5 <br />