My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
correspondence/maps/request for CC action - WCC issues
Orono
>
Property Files
>
Street Address
>
C
>
Chevy Chase Drive
>
128 Chevy Chase Drive - 36-118-23-41-0041
>
Correspondence
>
correspondence/maps/request for CC action - WCC issues
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:04:54 PM
Creation date
4/12/2016 11:51:35 AM
Metadata
Fields
Template:
x Address Old
House Number
128
Street Name
Chevy Chase
Street Type
Drive
Address
128 Chevy Chase Drive
Document Type
Correspondence
PIN
3611823410041
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The total projected size of the forty-nine (49) tees is 65,000 square feet. The <br /> estimated cost to build the tees is $1.44 per square foot or $93,600. <br /> Bunkers <br /> The bunker count for the project is sixty-three (63). In addition to shaping and <br /> drainage (already covered), new high quality sand will be installed. The estimated sand <br /> needed for each bunker(average) is 30 cubic yazds, or 45 tons (6" of non-compacted white <br /> bunker sand, 1,600 sq.ft. ea�h bunker). At an estimated price of$50 per ton, the sand cost <br /> for each bunker would be $2,250 or $141,750 total. To haul the sand to the bunker <br /> locations and spread the sand in the bunker will cost approximately $500 per bunker or <br /> $31,500. Therefore, the total cost for the feature construction portion of the bunkers is <br /> estimated to be $173,250 <br /> Based on these line items, the total budget for feature construction (not including <br /> optional greens) is $266,850. <br /> IRRIGATION <br /> A qualified irrigation designer has not reviewed the Master Plan in detail. We have <br /> included an allowance of�40,000 for this project until an expert in irrigation design can <br /> review the current system and make a study of the course changes. <br /> CART PATHS <br /> There will be a need to install approximately 1,140 lineal feet of new 8-foot wide <br /> asphalt cart path. The estimated cost to core out a well, install 2 inches of asphalt over 4 <br /> inches of gravel, and finish the edges once the paths aze installed, is estimated to be $10 per <br /> lineal foot or $11,400. There will also be 350 lineal feet of curbing at $3.00 per lineal foot. <br /> The price for curbing is �1,050. The total cost for cart path and curbing is �12,450. <br /> There will also be 350 lineal feet of the old path that must be removed. The cost for <br /> this work is estimated to be $2 per lineal foot or $1,700. <br /> The total estimated cost for cart paths is $14,150. <br /> GRASSING <br /> Sod <br /> In order to get certain areas back in play as soon as possible sod should be used. It <br /> is anticipated that all areas will be sodded, including tees. Steeper slopes near bunkers or <br /> tees should also be sodded. The total estimated amount of sod needed is 220,000 square <br /> feet. The estimated cost is $.32 per square foot or $70,400 installed. <br /> Hydroseeding <br /> In places where sodding is not done, it is recommended that the area be <br /> hydroseeded. There will be approximately 3 acres of hydroseeded surface an estimated <br /> cost of$1,200 per acre for a total of$3,600. <br /> Therefore, the total estimated budget for grassing is $74,000 <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.