My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P02923 - re-roof
Orono
>
Property Files
>
Street Address
>
C
>
Chevy Chase Drive
>
109 Chevy Chase Drive - 36-118-23-41-0010
>
Permits/Inspections
>
2000-P02923 - re-roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:03:58 PM
Creation date
4/7/2016 2:50:35 PM
Metadata
Fields
Template:
x Address Old
House Number
109
Street Name
Chevy Chase
Street Type
Drive
Address
109 Chevy Chase Drive
Document Type
Permits/Inspections
PIN
3611823410010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. All applications for structures which require driveway access or involve a change <br /> in use of an existing access to a County highway or City road, must be <br /> accompanied by an access permit issued by the Hennepin County Highway <br /> Department or Orono Public Works Department. <br /> 10. For projects which will require the installation of an on-site sewage treatment <br /> system, a site evaluation report and system design must be submitted with the <br /> building permit application. (See On-Site Systems Manager far more information.) <br /> 11. For all projects located within 1,000' of lakeshore, shoreland regulations and <br /> hardcover limitations apply. Hardcover, by defuution, is any structure, blacktop, <br /> or other material which interferes to any degree with the direct absorption of <br /> rainfall into the ground. Hardcover calculations must accompany each application <br /> involving additional or replacement proposed hardcover in the affected zoning <br /> districts. (See "Hardcover Worksheet" available at City offices.) <br /> C. One set of building plans and specifications noted with corrections or code compliance date <br /> and stamped as approved by the Building Official will be returned with the permit. This <br /> a��roved co�y must be ke�t on the individual job site, available to inspection personnel <br /> throu�hout the construction. <br /> D. A Certificate of Occupancy is required prior to the use or occupancy of any new structure <br /> erected within the City. This certificate will be issued by the Building Official at such <br /> time as final inspections demonstrate that code compliance has been achieved. Final <br /> inspections are required for all existing structures altered or changed in use. Changes in <br /> t}le use of the commercial structure must also be approved by the Zoning Department. <br /> E. Time of Construction. Section 12.05 <br /> Subd. 1. Permit Expiration. Notwithstanding continuing or on-going work, any <br /> building permit issued by the Ciry shall expire and by lunitation be null and <br /> void and shall require issuance of a new permit and payment of a full new <br /> permit fee if a Certificate of Occupancy and final completion has not been <br /> issued within the following lenath of time after the date of permit issuance, <br /> which new permit and fee shall be necessary to reimburse the City for on- <br /> going and more than normal number and cost of inspection services. <br /> A. Single Family Residential dwellings, including new construction, <br /> remodeling or additions: 24 months. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.