Laserfiche WebLink
� . <br /> ' BUILDING PERMIT APPLICATION PROCEDURE <br /> Each application for a building pernut shall be accompanied by the data indicated below. Failure <br /> to submit complete information will result in return of applications. Please read carefully the <br /> listed rec�uirements. <br /> ' 1. ALL APPLICATIONS <br /> A. Completed application forms including all information required in the numbered spaces, <br /> dated and signed by applicant. <br /> B. Two copies of building plans, drawn to scale, together with specifications containing the <br /> minimum information noted below: (requirement for building plans may,be waived by the <br /> Building Official for small structures or minor work). One set will remain on file with the <br /> City and one set will be returned to applicant. <br /> Residential Plan reviews will require a minimum of 7 to 10 working days for staff review. <br /> All new commercial structures must be approved by the Orono Council. Modification of <br /> existing commercial structures will require a minunum of 2 weeks for staff review. <br /> Minimum Information Required: <br /> 1. CERTIFICATE OF SURVEY (signed by a registered land surveyor). A survey <br /> is required for all types of construction including new homes, room additions, <br /> porches, decks and accessory buildings. The survey must include the legal <br /> description of property, location of existing and proposed structures on the site, <br /> location of all proposed improvements such as driveways, retaining walls, decks, <br /> sidewalks, etc. Lakeshore lots must show existing and proposed contours in <br /> minimum 2' increments. (Minimum survey standards handout available at City <br /> offices.) <br /> Survey Requirement Exemption - A survey will not be required for detached <br /> accessorv structures of less than 1,000 s.f. in total floor area when all of the <br /> following conditions are met:* <br /> a) The area of the property exceeds the minimum lot width/lot area standards <br /> of the zoning district. <br /> b) Owner/applicant has staked the location of the proposed structure meeting <br /> the required setbacks, and the property corner pins are staked and visible <br /> and a plot map of the property drawn to scale has been submitted. <br /> c) Owner/applicant has obtained written non-objection of most-affected <br /> adjacent property owner. <br /> *A survey will not be required for accessory structures without foundations and <br /> with less than 120 s.f. of projected roof area if b and c are met. <br /> A site inspection by City staff is required. Site inspection fee is $30.00 and shall <br /> be paid with the building permit. <br /> 1 <br />