My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-P11000 - replace garage floor only
Orono
>
Property Files
>
Street Address
>
C
>
Chevy Chase Drive
>
106 Chevy Chase Drive - 36-118-23-41-0033
>
Permits/Inspections
>
2007-P11000 - replace garage floor only
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:04:38 PM
Creation date
4/7/2016 2:16:36 PM
Metadata
Fields
Template:
x Address Old
House Number
106
Street Name
Chevy Chase
Street Type
Drive
Address
106 Chevy Chase Drive
Document Type
Permits/Inspections
PIN
3611823410033
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> , _.Y �hase Drive <br /> ' �;::;r� 'c�. .,�ir� <br /> • t <br /> STRUCTURAL NOTES <br /> MATERIAL STRENGTHS <br /> Structural Steel <br /> Anchor boits ASTM F1554, Gr. 36 <br /> Pipe columns ASTM A501, Fy= 36 ksi <br /> Wide flange beams ASTM A992, Fy= 50 ksi <br /> Reinforcing Steel <br /> Bars, ASTM A615 Gr. 60, Fy= 60 ksi <br /> Fabric, ASTM A185 Gr. 60, Fy=60 ksi <br /> Concrete <br /> f 'c=compressive strength in 28 days <br /> 3,500 psi for conc.topping. <br /> DESIGN �OADS <br /> Floors <br /> Dead load <br /> 64 psf <br /> Live loads <br /> 50 psf <br /> EXISTING CONDITIONS <br /> Contractor shall verify all dimensions, elevations, and details of existing structure where <br /> they affect this construction prior to fabrication. <br /> TEMPORARY BRACING <br /> Contractor is responsible for bracing, without overstressing, all structural elements as <br /> required at all stages of construction until completion of this project. Provide temporary <br /> lateral support for all walls until walls are adequately braced by floor or roof structure. <br /> Shore foundation walls retaining earth until floor framing and basement slab are in <br /> place. Use caution when operating equipment adjacent to foundation walls. <br /> Shore metal decking until concrete topping has cured to 75% of the specified strength. <br /> STRUCTURAL STEEL <br /> All structural steel shall be designed, fabricated, and erected according to the <br /> specifications of the American Institute of Steel Construction (A.f.S.C.) Latest Adoption. <br /> Structural steel suppfier shall supply all cap plates, bearing assemblies, base plates, <br /> stiffeners, splices and connections, and shall design same unless noted on drawings. <br /> All welding shall be done by the shielded arc process using E70 electrodes in <br /> accordance with the rules of the American Welding Society(A.W.S.) Structural <br /> Welding Code, Latest Adoption. <br /> Atl welders shall be certified by the rules of the American Welding Society. <br /> ; ; , , = <br />
The URL can be used to link to this page
Your browser does not support the video tag.