Laserfiche WebLink
ADMINISTRATION � <br /> nection with or concurrently with the work authorized by a in place,but before any plaster is applied,or before wall- <br /> building permit shall not relieve the applicant or holder of the board joints and fasteners are taped and finished. <br /> permit from the payment of other fees that are prescribed by <br /> law. R109.L6 Final inspection.Final inspection shall be made <br /> after the permitted workis complete and priar to occupancy. <br /> R108.5 Refunds.The buildin�official is authorized to estab- <br /> lish a refund policy. R109.2 Inspection agencies.The building official is authorized <br /> to accept reports of approved agencies,provided such agencies <br /> satisfy the requirements as to qualifications and reliability. <br /> SECTION R109 R109.3 Inspection requests.It shall be the duty of the permit <br /> INSPECTIOfdS holder or their agent to notify the building official that such <br /> R109.1 'I�pes of inspections. For onsite construction, from �'ark is ready for inspection.It shall be the duty of the person <br /> time to time Yhe building official, upon notification from the requesting any inspections required by this code to provide <br /> permit holder or his agent.shall make or cause to be made any access to and means for inspection of such work. <br /> necessary inspections and shall either approve that portion of R109.4 Approval required. Work shall not be done beyond <br /> the construction as completed or shall notify the permit holder the point indicated in each successive inspection withouC first <br /> or his or her agenC wherein the same fails to comply with this obtaining the approval of the building offcial. The building <br /> code. official upon notification,shall make the requested inspections <br /> R109.1.1 Foundation inspection.Inspection of the foun- and shall either indicate the portion of the construction that is <br /> dation shall be made after poles or piers are set or trenches or satisfactory as completed,or shall notify the permit holder or <br /> basement areas are excavated and any required forms an a�ent of the permit holder wherein the same fails to comply <br /> � erected and any required reinforcing steel is in place and with this code. Any portions that do not comply shall be cor- <br /> supported prior to the placing of concrete. The foundation rected and such portion shall not be covered or concealed until <br /> inspection shall include excavations for thickened slabs authorized by the building official. � <br /> intended for the support of bearing walls,partitions, struc- <br /> tura] supports, or equipment and specia] requirements for <br /> wood foundations. SECTION R110 <br /> R109.1.2 Plumbing,mechanical,gas and electrical sys- CERTIFICATE OF OCCUPAN�Y <br /> tems inspection.Rou�h inspection of plumbin�,mechani- R110.1 Use and occupane��.No building or structure shall be <br /> cal, gas and electrical systems shall be made prior to used or occupied, and no change in the existinb occupancy <br /> covering or concealment, before fixtures or appliances are classification of a building or structure or portion thereof shall <br /> set or installed,and prior to framing inspection. be made until the buildinb official has issued a certificate of <br /> Exception: Back-filling of ground-source heat pump occupancy therefor as provided herein.Issuance of a certif cate <br /> loop systems tested in accordance with Section M2105.1 of occupancy shall not be construed as an approval of a viola- <br /> prior to inspection shall be permitted. tion of the provisions of this code ar of other ordinances of the <br /> jurisdiction.Certificates presuming to give authority to violate <br /> R1091.3 Floodplain inspeetions. For construction in or cancel the provisions of this code or other ordinances of the <br /> areas prone to floodin�as established by Table R3012(1), jurisdiction shall not be valid. <br /> upon placement of the lowestfloor,including basement,and <br /> prior to further vertical construction, the building official Exceptions: <br /> shall require submission of documentation, prepared and 1. Certificates of occupancy are not required for work <br /> sealed by a registered design professional, of the elevation exempt from permits under Section R105.2. <br /> � of the lowest floor,including basement,required in Section <br /> R324. 2. Accessory buildings or struetures. <br /> R109.1A Frame and masonry inspection. Inspection of R110.2 Change in use.Changes in the character or use of an <br /> framing and masonry construction shall be made after the existing structure shall not be made except as specified in Sec- <br /> roof,masonry,all framing,firestopping,draftstopping and tions 3406 and 3407 of the International Building Code. <br /> bracing are in place and after the plumbinb,mechanical and R110.3 Certificate issued.After the building official inspects <br /> electrica]rough inspections are approved. the building or structure and finds no violations of the provi- <br /> R109.1.5 Other inspections. In addition co the called sions of this code or other laws that are enforced by the depart- <br /> inspections above,the building official may make orrequire ment of building safety, the building official shal] issue a <br /> any other inspections to ascertain compliance with this code certificate of occupancy which shall contain the following: <br /> and other laws enforced by the buildina official. 1. The building permit number. <br /> R109.1.5.1 Fire-resistance-rated construction 2. The address of the structure. <br /> inspection. Where fire-resistance-rated construction is <br /> required between dwellino units ar due to location on 3. The name and address of the owner. <br /> property,the building official shall require an inspection 4. A description of tha�portion of the structure for which <br /> of such construction after all lathing and/or wallboard is the certificate is issued. <br /> 6 2006 INTERNATIONAL RESIDENTIAL CODE� <br />