My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-P09148 - demo
Orono
>
Property Files
>
Street Address
>
C
>
Cherry Avenue
>
3925 Cherry Avenue - 08-117-23-33-0086
>
Permits/Inspections
>
2005-P09148 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:45:39 PM
Creation date
4/4/2016 2:56:10 PM
Metadata
Fields
Template:
x Address Old
House Number
3925
Street Name
Cherry
Street Type
Avenue
Address
3925 Cherry Ave
Document Type
Permits/Inspections
PIN
0811723330086
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a5o ek,�rc�o �I o9/5�8 ( <br /> 9-7-0� "J� <br /> . . �`�Q�, <br /> CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT � <br /> P.O. Box 66 (2750 Kelley Parkway) <br /> Crystal Bay,MN 55323 <br /> SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br /> General Instructions <br /> 1. You may be required to obtain other permits,i.e. well abandonment, etc. <br /> 2. Work must not begin unless the permit card is available on the job site. <br /> 3. A 24 hour notice is required for all inspections. Call(952)249-4600. <br /> JOB SITE ADDRESS: '��'�� �` �-� ;�-���`=-f'�ti�i ��U 4-- - <br /> Occupancy Type: �� Residential Commercial <br /> �/, iu�- .�t.�n <br /> OWNER'S NAME: ��� �-l`r" ,��T(�:=��`��� .a�.l`;�i� Phone: ���j �1�r1�� -�i>'? <br /> MailingAddress: :���'� ��"� � � �_ �D<j-f-E �1� Ciry: �}/��{.- <br /> CONTRACTOR'S NAME: ��='>.=; C� �% Bus.No.:�f"�-(-- "��'��% �>—�'�?Ci C%I�-Ci <br /> Mailing Address: City: <br /> Demolition if planned by means o£ manual disassembly <br /> �heavy equipment <br /> Permits Issued: <br /> # Well Abandonment <br /> In return for issuance of said Demolition Permit,the undersigned owner hereby agrees as follows: <br /> l. The structure(s) shall be kept enclosed and/or secured until such time as demolition is <br /> complete. <br /> 2. Demolition debris will be kept off adjoining property and/or the public rights-of-way unless <br /> specific prior approval is obtained in writing for temparary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health Department regulations. <br /> 6. Sewer and water must be disconnected at the services at the street by qualified contractars. <br /> 7. Inspection required when all debris has been removed,before backfilling. <br />
The URL can be used to link to this page
Your browser does not support the video tag.