My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Info on as-built/other issues dealing with COO
Orono
>
Property Files
>
Street Address
>
C
>
Cherry Avenue
>
3925 Cherry Avenue - 08-117-23-33-0086
>
Correspondence
>
Info on as-built/other issues dealing with COO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:45:41 PM
Creation date
4/4/2016 2:29:04 PM
Metadata
Fields
Template:
x Address Old
House Number
3925
Street Name
Cherry
Street Type
Avenue
Address
3925 Cherry Ave
Document Type
Correspondence
PIN
0811723330086
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, ,ADMINlSTRATION <br /> nection with or concurrently with the work authorized by a in place,but before any plaster is applied,or before wall- <br /> building permit shal]not relieve the applicant or holder of the board joints and fasteners are taped and finished. <br /> permit from fne payment of other fees that are prescribed by R1Q9.1.6 Final i[tspection.Final inspection shall be made <br /> law. after the permitted work is complete and prior to occupancy. <br /> R10S.� Refunds.The buildin�official is authorized to estab- R109.2Inspection ageacies.The building official is authonzed <br /> Iish a refund policy. <br /> to accept report.e of approved agencies,provided such agencies <br /> satisfy the requirements as to quatifications and reliability. <br /> SECf10N R149 R1Q9.3 Inspection requests.lt shall be the duty of the permit <br /> IN!SPcCTl01`"S holder or their agent[o notify the buildino official that such <br /> R109.1 Types of inspections. For onsite construction, from �'ork is ready for inspection.It shall be the duty of the person <br /> time to time the builciing official, upon notification from the requesting any inspections required by this code to provide <br /> permit holder or his agent,shall make or cause to be made any access to and means for inspection of such work. <br /> necessary inspec[ions and shall either approve that portion of R109.4 Approval required. Work shall not be done beyond <br /> the conswction as completed or shail notify the permit holder �e point indicated in each successive inspection witl�out first <br /> or his or her a�ent wherein the same fails to comply with this ��htaining the approval of the buildinb official. The buiiding <br /> code. officiai upon notification,shal]make the requested inspections <br /> R109.1.1 Foundafion inspeetion.Inspection of the foun- and shall either indicate the portion of the construction that is <br /> dation shall be made after po3es or piers are set or trenches or satisfactory as completed, or shall notify the permit holder or <br /> basemenc areas are excavated and any required forms an aaent of the permit holder wherein the same fails to comply <br /> � erected and any required reinforcing stee] is in place and with this code. Any portions that do not comply shall be cor- <br /> supported prior to the placinD of concrete.The foundation rected and such portion shal]not be covered or concealed unu] <br /> inspection shall include excavations for thickened slabs authorized by the building official. <br /> intended for the support of bearinD walls,partitions, struc- <br /> tural supports, or equipment and special requirements for <br /> woodfoundations. SECTION Ri10 <br /> R109.1.?,Piumbinb,mechanical,�as and eiectrical sys- CERTIrICIQ,TE OF OCCt1PANCY <br /> tems inspection.Rough inspection of plumbina,mechani- R110.1 Use and occupanc��.No building or structure shall be <br /> cal, gas and electrical systems shall be made prior to used or occupied, and no change in the existinb occupancy <br /> covering or concealment,before fixtures or appliances are classification of a buildin�or structure or ponion thereof shall <br /> set or installed,and prior to framing inspection. be made until the buildinc official has issued a certificate of <br /> Exception: Back-filling of �round-source heat pump occupancy therefor as provided herein.Issuance of a certificate <br /> loop systems cested in accordance with Section M21 U5.1 of occupancy shall not be construed as an approvai of a viola- <br /> prior to inspection shall be permitted. tion of the provisions of this code or of other ordinances of the <br /> jurisdiction.Certificates presuming to give authority to violate <br /> R109.1.3 Fiooc�plain inspec6ons. For construction in or cancel the provisions of this code or other ordinances of the <br /> areas prone to floodin�as established by Table R3C312(1), jurisdiction shall not be vaiid. <br /> upon placement of the lowesttloor,includinc basemen�_and <br /> prior to fur[her vercical construction, the buildin� official Exceptions: <br /> shall require submission of documentation. prepared and 1. Certificates of occupancy are not required ior work <br /> sealed by a registered design professional,of the elevation exempt from permits under Section R105?. <br /> � of the low�st floor,including basement,required in Section �. Accessor}�bui]dings or structures. <br /> Ri24. <br /> R109.1.4 Frame and masanry inspection. Inspection of Rll�.2 Change in use.Chan�es i.n the character or use of an <br /> framina and masonry construction shall be made after the existing structure shall not be made except as specified in Sec- <br /> roof,masonry, all fratninp,firestoppin�, draftstopping and tions 3406 and 3407 of the International Building Code. <br /> bracing are in place and after the plurnbing.mechanical and g11Q.3 Certificate issued.After the building officia]inspects <br /> elecuical rough inspections are approved. the building or structure and finds na violations of the provi- <br /> Rl(l9.1.� Other inspeetions. In addition co the calied sions of this code or other laws that are enforced be the depart- <br /> inspections above,the building official may make or require ment af buildin� safety, the buildin� ofFicial shall issue a <br /> any other inspections to ascertain compliance with this code ceniFicate of occuPancy which shall contain the following: <br /> and other laws enforced hy the buildin�official. 1. The buildin�perau�number. <br /> R109.2.�.1 Fire-resistance-rated construction �. The address of the structure. <br /> inspectian. Where fire-resistance-rated construction is ;. The name and address of the owner. <br /> required between dwellin� units or due to location on <br /> property,the buildin�official shall require an inspection 4. A descrip�on of that portion of the structure for which <br /> of such construction after all iathin�and/or wallboard is the cenificate is issued. <br /> 6 2006 INTERNtiTIONAL R�SIQENTIAL CODE� <br />
The URL can be used to link to this page
Your browser does not support the video tag.