My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-P06942 - septic
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4775 Bayside Road - 06-117-23-22-0019
>
Septic
>
2003-P06942 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:24:57 PM
Creation date
4/1/2016 2:51:04 PM
Metadata
Fields
Template:
x Address Old
House Number
4775
Street Name
Bayside
Street Type
Road
Address
4775 Bayside Rd
Document Type
Septic
PIN
0611723220019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F-17 <br /> ,��' TMP SELECTTON PROCEDURE <br /> E1D PERFORAiION OF n PERFORATED LATEQ/+L <br /> A. Determine pump capacity: �..•�.� <br /> Gravity Distribution *«.«� <br /> 1. Minimum suggested is 600 gallons per hour(]0 gpm)to stay ahead of � ,,�,.N„w F,e,k,,,,,,� <br /> water use rate. '`"�'�`�"� ��""•��"•�`� <br /> ��,����� <br /> 2. Maximum suggested for delivery to a drop box of a home system is 2,700 . , ����;o���°^�°", <br /> gallons per hour(45 gpm)to prevent build-up of pressure in drop box. .:.,,•�,w -u�.,.� �:•�e E.a. <br /> o ie .r a«a w,« <br /> ... . � P.r�aawr lsm�w e� <br /> Pressure Distibution . "�^�°�°� �'�""'~`'""� <br /> 3.a. Select number of perforated laterals 3 ' <br /> b. Select perforation spacing= 3 feet �:;'�„�����"° <br /> c. Subtrad 2 ft from the rock layer length. <br /> ��-2ft=�feet <br /> d. Deter�rrune the number of spaces between perforations. <br /> ? ft.=L�spaces <br /> I.ength perf.spacing=3�ft.+ � Requimd Perforaaon Dischazge <br /> e. L spaces+ 1 = I� perforations/lateral �n�11°�per II"I"'�e�gp�'� <br /> f. Multiply perforations per lateral by number of laterals to �l y�a,p, ��e 32 m��", 4 ad� <br /> get total numberof perforations. �,�� x �„ �Q,,= � � perforations. �f�c) <br /> g. � X ��.�'=3�gP�,. 1.Oa 0.56 0.74 � <br /> SE�.ECI'ED PUMP CAPACTIY�gpm 2.�b 0.g� l.�t� <br /> B.Determine head requirements: a. Use for single family homes <br /> 1. Elevarion difference between pump and point of discharge. b. Use for ail other applications <br /> SS feet <br /> :;:^� 2. If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold if gravity�stem,zero. <br /> �, feet <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. , �P�L�B� , <br /> Read friction loss in feet per 100 feet from table. � Poin�of Discharg� <br /> F.L=I , � ft./100 ft of pipe �'O�� <br /> b. Determine total pipe length from pump to discharge Elevatian Differrnce <br /> poinL Add 2S percent to pipe length for fitting p,u„p /ooc�, <br /> loss,or use a fitting loss chart. Equivalent pipe <br /> length-1.25 times pipe length= F-18b <br /> 'L1(� x 1.25= 5� feet <br /> 1.5 inch 2.0 inch 3.0 inch <br /> c. Calculate total friction loss by multiplying �m Friaimloaper IOOfto(pipe <br /> friction loss in ft/100 h by equivalent pipe length. 10 0.69 0.20 <br /> To�l friction loss•= /• � x S 0 +100=_�feet 12 0.96 0.28 <br /> 4. Total head required is the sum of elevation difference, 14 1.28 038 <br /> special head requirements,and total friction loss. 16 1.63 0.48 <br /> 18 2.03 0.60 <br /> 20 2.47 0.73 0.11 <br /> � + �v� +� 25 3.73 1.11 0.16 <br /> (1) (2) (3c) 30 5.23 1.55 0.23 <br /> 35 7.90 2.06 0.30 <br /> � 40 11.07 2.64 0.39 <br /> TOTAL HEAD �_feet 45 1a.73 3.28 0.48 <br /> 50 3.99 0.58 <br /> 55 4.76 0.70 <br /> C. Pump selection bo s.bo o.s2 <br /> 1. A pump must be selected to deliver at least <br /> :� 31_gpm (Step A) with at least 1�feet of total head (Step B). <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.