Laserfiche WebLink
, � . ` � � .� � 7� <br /> v <br /> ��- <br /> CITY OF ORONO SEPTIC SYSTENI PERNIIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, l�In 5�323 <br /> JOB SITE ADDRESS��,j 7S S Y��1 �.S � b E' �C� <br /> Occupancy Type: Residential � Commercial Other <br /> Permit Type: New or Replacement System $100.00 x � �i j���, ;;�''� <br /> Repair Esisting System $ 50.00 <br /> (Tanks or Drainfield) <br /> $0.50 State surcharge added to above fees <br /> * See fee schedule for non-residential permit fees <br /> Owner's l�Tame: �(!C v �(!�L K�y/�I/�C�(�'/l Phone Number: („/ - c�� - '�� <br /> Mailing Address: � City:--1���� Zip: <br /> Contractor's l�Tame: � �^ ' ' �'v ' � � C Phone Number: I.- - '- 75 <br /> Mailing Address: -�t ';'� /1.�.H City: �I'If�%S Zip: SSS��� <br /> *** DO NOT MAII.PAYNIENT"'ITH THIS APPLICATION*** <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in person <br /> at the City Offices and work must not begin unless the permit card is on the job site. <br /> 2. Permits will be issued only to contractors holdin� a Minnesota Pollution Control <br /> Ajency(NIPCA) Septic System Installers License. <br /> 3. All work must be done in accordance�vith the approved septic system design. Design reports <br /> are not �onside:ed approved unless accompanied by the "City of Orono Septic System <br /> Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, an�i general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to coverin;. For mounds, inspection is required after <br /> rou�h up but prior to sand placement (sand will be jar tested for silt content), and again <br /> during pressure distribution pipin� installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (�vhere required) components are functional and comply with codes. <br /> 5. Individual holdin�i�d'CAlnstallers License shall be present during all inspections. A 24-hour <br /> notice is requii•ed foi•all inspections. <br />