My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010557 - septic
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4725 Bayside Road - 06-117-23-22-0022
>
Septic
>
1998-010557 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:02 PM
Creation date
4/1/2016 2:42:00 PM
Metadata
Fields
Template:
x Address Old
House Number
4725
Street Name
Bayside
Street Type
Road
Address
4725 Bayside Rd
Document Type
Septic
PIN
0611723220022
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� F-17 <br /> � PiIMP SFT.F['rTC)N PROCEDURE <br /> E1p PERFOfiAT70H OF A PERFORATED l'+TEFAL <br /> � Dekezmine pump capadty: w�•�•• <br /> Gravity Disfribution r,,.e„ <br /> 1_ Minimum suggested is 600 gallons per hour(10 gpm) to stay ahead of _ :..- - <br /> �'�L�r�a��� Loyr ef GeeNnW Foblt(V 1v• <br /> Wa�T ILSe rdt2. 'rR��+or.ei nor s a.�...a <br /> � .�,�'.a,o.+,o=o.�i. <br /> 2 Maximum suggested for delivery to a drop box of a home system is 2,700 _ . �+�,�tr��� ��=����h <br /> tiro tno ra.or ioo <br /> gallons per hour(45 gpm)to prevent build-up of pressure in drop box. �,,;R,� _., ,.�„ ,2•„E��, <br /> n.�e of Roct u�.r <br /> ... . � Prlxmbn LscatH ot <br /> Pressure Distibufian ��••"�,�,� �'"°",«�•�•"� <br /> 3_a Select number of perforated laterals 3 <br /> b. Select perforation spacing=�_feet �,��'�„�''"° <br /> c Subtract 2 ft from the rock layer length. <br /> �- � -2 ft=�( S�feet <br /> d. Dete�ine the number of spaces bet�veen perforations. <br /> Length perf.spacing=�_ft.+ 3 fc.= a a. SPaceS Required Perforaeon Discha�ge <br /> � �_SpaCeS+ 1=�PPSfOrdtiollS/1dt�Id1 u�gallons per minute(gpm) <br /> f_ Multiply perforations per lateral b� numbe�f]aterals to ��3Z ��d8e �Zm�� i Ad� <br /> get total numberof perforations. ,���� x �s t�= �i perforations. �f��� <br /> g- 1� x�P„�_�`_'SPm. <br /> 1.Oa 0.56 0.74 <br /> SELECTED PUMP CAPACITY�gpm 2.�b �.g� 1.�4 <br /> B_Determine head requirements: a.Use for single family homes <br /> 1. EIevation difference between pump and point of discharge. b.Use for all other applications <br /> �_feet <br /> `� 2 If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold if gravity�stem,zero. <br /> �_feet <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. Pipe L«�grh <br /> Read friction loss in feet per 100 feet from table. � poinc of D�scharge <br /> F.L= ,�. le ft./100 ft of pipe a��. <br /> b. Deternune total pipe length from pump to discharge Flevadon Difference� <br /> poin� Add 25 percent to pipe length for fitting p�P _��3 <br /> loss,or use a fitting loss chart. Equivalent pipe <br /> length-1.25 times pipe length= <br /> �D x 1.25=���feet F-18b <br /> c. CalCulate total friCtion loss b multi I n 1.5 inch 2.0 inch 3.0 inch <br /> Y P Y� g �m Friaim loct per 100 R of pipc <br /> friction loss in ft/100 ft by equivalent pipe length. <br /> Total hicdon loss= a,l� x Sv +100= � feet 10 0.69 0.20 <br /> 12 0.96 0.28 <br /> 4. Total head required is the sum of elevation difference, 14 1.28 0.38 <br /> special head requirements,and total friction loss. 16 1.63 0.48 <br /> 18 2.03 0.60 <br /> 20 2.47 0.73 0.11 <br /> �. + � +�_ 25 3.73 1.11 0.16 <br /> (1) (2) (3c) 30 5.23 1.55 0.23 <br /> 35 7.90 2.06 0.30 <br /> 40 11.07 2.64 0.39 <br /> TOTAL HEAD �_feet � 45 14.73 3.28 0.48 <br /> 50 3.99 0.58 <br /> 55 4.76 0.70 <br /> G Pump selection bo s.6o o.s2 <br /> � 1. A pump must be selected to deliver at least <br /> �= gpm (Step A) with at least �feet of total head (Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.