My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P02833 (septic)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4485 Bayside Road - 06-117-23-21-0003
>
Septic
>
2000-P02833 (septic)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:24:22 PM
Creation date
4/1/2016 2:32:07 PM
Metadata
Fields
Template:
x Address Old
House Number
4485
Street Name
Bayside
Street Type
Road
Address
4485 Bayside Rd
Document Type
Septic
PIN
0611723210003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUMP SELECTION PROCEDURE <br /> A. Determine pump capacity: <br /> Gravity Distribution <br /> i. Minimum suggested is 20 gpm <br /> 2. Maximum suggested is 45 gpm Perfontion Discharges in GPM <br /> Pressure Distibution Head Perforation diameter <br /> feet inches <br /> 3. a. Select number of perforated laterals 3 �/32 i/4 <br /> b. Select perforation spacing= _' feet. 1.oa o.56 0.�4 <br /> c. Subtract 2 ft.from the rock.layer length. �.5 0.69 0.90 <br /> -2 ft.= Lc� feet. �.ob o.so i.a� <br /> x«k y r�i�„sa, . <br /> d. Determule the number of spaces between perforations. a use�.o foot single hon,es. <br /> Length perf.spacing=�ft.+�ft._ "L c� spaces b Use 2.0 feet for anything else. <br /> e. 1s2,spaces+1 =�_perforations/lateral <br /> f. Multiply perforations per lateral by nwnber of laterals to )��� ' � <br /> get total number of perforations. � x �5 T«� _ �:'� perforations. <br /> g. ��' � ` _.�..gp <br /> ,�:�x �� m. <br /> SELECTED PUMP CAPACI'TY � -L gpm <br /> B.Deteraune head requirements: <br /> 1. Elevation difference between pump and point of dischazge. <br /> '- � feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure ������^�Sr�« <br /> required at manifold if gravity system,zero. a�•:"�`a• , <br /> ���:,.., <br /> 5 feet Tota!pipe Im6th <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. w� . ��,,tia,���,tt <br /> Read friction loss in feet per 100 feet from table(F-14). P'�` <br /> F.L._ �,�), ft./100 ft of pipe �' � � � � <br /> ...............- � - <br /> b. Determuie total pipe length from pump to discharge ------------•------------------------ `-i'i�: <br /> point. Estimate by adding 25 percent to pipe length for fitting <br /> loss,or use a fitting loss chart(F-15 feet). <br /> Equivalent pipe len�th 1.25 times pi e length= <br /> ': r x 1.25=�_feet Friction Loss in Plastic Pipe <br /> c. Calculate total friction loss by multiplying <br /> friction loss in ft/100 ft by equivalent pipe length. Nominai <br /> Total friction loss= �x �"i' ; +100= 1 S' feet pipe dia. <br /> 4. Total head required is the sum of elevation difference, Flow Rate 1.5" 2" 3" <br /> special head requirements,and total friction loss. �� <br /> �- i 20 2.47 0.73 0.11 <br /> �_+ S + l J 25 3.73 1.11 0.16 <br /> ' (1) (2) (3c) 30 5.23 1.55 0.23 <br /> 35 6.96 206 0.30 <br /> 40 8.91 264 0.39 <br /> TOTAL HEAD �L� feet 45 11.07 3.28 0.48 <br /> 50 13.46 3.99 0.58 <br /> C. Pump selection 60 5.60 o.s� <br /> 65 6.48 0.95 <br /> 70 7.44 1.09 <br /> 1. A pump must be selected to deliver at least <br /> � '" gpm (Step A) with at least '�.� feet of total hea�i (Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.