My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10164 - septic
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4455 Bayside Road - 06-117-23-21-0002
>
Septic
>
2006-P10164 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:24:18 PM
Creation date
4/1/2016 2:22:39 PM
Metadata
Fields
Template:
x Address Old
House Number
4455
Street Name
Bayside
Street Type
Road
Address
4455 Bayside Rd
Document Type
Septic
PIN
0611723210002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, PUMP SELECTION PROCEDU E <br /> ' 1. Determine pump capacity: <br /> A. Gravity Distribution <br /> 1. Minimum required discharge is 10 gpm <br /> ' 2. Maximum suggested discharge is 45 gpm <br /> For other establishments at least 10%greater than the water <br /> supply rate,but no faster than the rate at which effluent will flow <br /> , out of the distribution device <br /> B. Pressure Distribution-see pressure design worksheet soii r;E�t�.,e�,f Sysren, <br /> & point of discharge <br /> ' Selected Pump Capacity: 20 gpm ��1�i ��pe �•��� <br /> ��ngtr� f <br /> ir�let � ?A., elevotlon' <br /> � 2. Determine head re uirements: ���� ""�'� a�ffe�ence) <br /> q �'��Je ;' �E i <br /> A. Elevation difference between pump and point of discharge. j I <br /> 10 feet ' " � <br /> ---- �_..._:..'�`:��Ey -. . _ .�..--- <br /> , B. Special head requirement?(See Figure-Special Head Requirements) <br /> ��feet Special Head Requirements <br /> � Gravity Distribution Oft <br /> C. Friction loss Pressure Distribution 5ft <br /> 1. Select pipe diameter C�in � <br /> � 2. Enter Figure E-9 with gpm(1A or B)and pipe diameter(C1) <br /> Read friction loss in feet er 100 feet from Figure E-9 E•9 Friction Loss in Plastic Pipe <br /> Friction loss= 0.73 ft/100 ft of pipe I per 100 ft <br /> , nominal <br /> 3. Determine total pipe length from pump discharge to soil system discharg point. Flow Rate i e diameter <br /> Estimate by adding 25 percent to pipe length for fitting loss. gpm 1.5" 2.0" 3" <br /> Equivalent pipe length times 1.25=total pipe length 20 2.47 0.73 0.11 <br /> ,, 125 ft x 1.25= 156.25 feet 25 3.73 1.11 0.16 <br /> 30 5.23 1.55 0.23 <br /> , 4. Calculate total friction loss by multiplying friction loss(C2) 35 6.96 2.06 0.3 <br /> by the equivalent pipe length(C3)and divide by 100. 40 8.91 2.64 0.39 <br /> FL= 0.73 ft/100ft X 156.25 ft / 100= 1.1 feet 45 11.07 3.28 0.48 <br /> 1 50 13.46 3.99 0.58 <br /> D. Total head requirement is the sum of elevation difference(A),special 55 4.76 0.7 <br /> head requirements(B),and total friction loss(C4). 60 5.6 0.82 <br /> ' 10 ft + 0 ft + 1.1 ft 65 6.48 0.95 <br /> 70 7.44 1.09 <br /> Total Head: 11.1 feet <br /> ' 3. Pump Selection <br /> 1.A pump must be selected to deliver at least 20 gpm(1A or B) <br /> , with at least 11.1 feet of total head(2D). <br /> � I <br /> , I <br /> Page 1 of 1 <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.