Laserfiche WebLink
From:ALLSTAR CONSTRUCTION 17634796900 04/27/2015 10:34 #142 P.004/005 <br /> Steep Sloae Roof Replacement(Asphalt Option) <br /> 1. Provide dumpsters and building permit. <br /> 2. Remove and dispose existing cedar shakes,felt underlayment, ice and water shield (if <br /> possible),valley fiashings, pipe flashings,and roof vents. Existing dormer flashings,step <br /> flashings, kick out flashings,drip edge,and gutter apron to remain in place and be re-used. <br /> 3. Remove existing metal hip and ridge and dispose. <br /> 4. Provide and install ice and water shield at eave and va�ley locations per local building code. , <br /> 5. Provide and install 15#felt underlayment at all areas not covered by ice and water shield. <br /> 6. Provide and install prefinished metal W valley{open style unless directed otherwise). <br /> 7. Provide and install GAF Timberline HD architectural asphalt shingles with matching hip and <br /> ridge. <br /> 8. Provide and install prefinished metal pipe flashings. <br /> 9. Provide and insta�l kitchen and bath vents at existing locations. <br /> 10. Provide and install roof ventilation to match existing. <br /> 11. Provide and install unpainted bonde�ized rnetal valley pan on main house and L shaped <br /> chimney pan on detached garage. <br /> 12. Existing chimney saddle and flashing to be re-used. <br /> a. Allstar Construction will not warranty existing chimney flashing unless replaced <br /> 100%. This can be done for an additionai charge. <br /> 13. Clean up construction related dehris and dispose. <br /> 14. Existing skylights and skylight flashings are to remain in place and be re-used. Allstar <br /> Construction will not take responsibility for integrity of skylights or flashing systems unless <br /> they are replaced with new units. <br /> 15. Due to reducing thickness of roofing material from cedar to asphalt,there may be a visible <br /> gap between the wall cladding and roofing material. Gounterffashing can be added for an <br /> additional charge. <br /> Main House: $10,535.00 �`�r� <br /> . , . omp e e at same ime a ���'�� <br /> PB•z <br />