My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Subsurface exploration info-1994
Orono
>
Property Files
>
Street Address
>
C
>
Casco Point Road
>
3026 Casco Point Road - 20-117-23-34-0026
>
Land Use
>
Subsurface exploration info-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:59:11 PM
Creation date
3/31/2016 12:29:19 PM
Metadata
Fields
Template:
x Address Old
House Number
3026
Street Name
Casco Point
Street Type
Road
Address
3026 Casco Point Road
Document Type
Land Use
PIN
2011723340026
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� SUBSURFACE EXPLORATION <br /> LOT 2, BLOCK 1 <br /> KELLY 2nd ADDITION <br /> ORONO, MINNFSOTA <br /> ALLIED No. 94117 <br /> negative skin fricdon, (downdrag), would be transferred to the piles as a result of the weight of <br /> the existing and planned fills and consolidation of the existing weak soils. <br /> Our computations indicate that piles driven to a depth of 45 feet below grade, at the <br /> location of SPT-4, would attain a safe working load of 35 tons per pile with a minimum factor <br /> of safety of 2.5. Based on pile driving to that depth, the net working load per pile would then <br /> be 20 tons. That would be the load capacity available for structural support of the building. <br /> The timber piles should conform with the requirements of MN/DOT specification 3471. <br /> The piles should be furnished and installed in accordance with the construction requirements of <br /> MN/DOT 2452. The pile driving work should begin with a test pile. Driving records should be <br /> maintained for all piles in order to facilitate computation of capacities using a suitable pile <br /> driving formula. Once the test piles have been driven and judged suitable, the remaining piles <br /> may be installed. To attain a working load capacity of 35 tons per pile, we recommend the piles <br /> be driven with a hammer having a manufacturer's rated energy on the order of 17,000 to 21,000 <br /> foot-pounds. <br /> There will be some loss of grade around the exterior of the residence during the lifetime <br /> of the structure. We suggest that this setdement be considered in the installation of the utilities. <br /> The utilities should have fle�cible connections to the house so that the settlement does not result <br /> in the shearing off or damage to the utilities. A structural engineer, registered to practice in the <br /> state of Minnesota should be retained for the design of the pile cap and grade beam system. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.