My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-00190 - mechanical
Orono
>
Property Files
>
Street Address
>
C
>
Casco Point Road
>
2975 Casco Point Road - 20-117-23-31-0045
>
Permits/Inspections
>
2014-00190 - mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:56:31 PM
Creation date
3/30/2016 10:58:39 AM
Metadata
Fields
Template:
x Address Old
House Number
2975
Street Name
Casco Point
Street Type
Road
Address
2975 Casco Point Road
Document Type
Permits/Inspections
PIN
2011723310045
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> �� FOR CIT 'USE ONLY <br /> O City of Orono ��j <br /> � �O P.O.Box 66 Date Received"/�� Permit# .�/ — /�� <br /> 2750 Keliey Parkway <br /> Crystal f�ay,MN 55323 Approved By: Amount$: <br /> Phone(952)249-4600 Fax(952)249-4616 <br /> -� �. <br /> y � <br /> F �� <br /> �." CITY OF ORONO—MECHANICAL PERMIT <br /> ��k�s��� (All Commercial permits must be approved by'the Buildina 01�ficial or Inspector and/or Fire Marshall) <br /> GENERAL INFORMATION <br /> I. You may apply for mechanical permits by mail or in person at the City offices. Applications will <br /> be reviewed and a permit will be issued within two working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT <br /> VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE <br /> PERMIT CARD IS POSTED ON THE JOB SITE. <br /> 3. Mechanical Desi�—Complete calculations,details and specifications are required for each <br /> heating,ventilation,humidification-dehumidification,and air conditioning installation including <br /> heat loss/heat gain calculation,design temperatures,equipment ratings and identification as to <br /> type,manufacturer and model. Data shall be presented on form provided. <br /> 4. When any new construction or remodeling is involved,a separate building permit must be <br /> obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work must be inspected(rough-in and final). Call (952)249-4600. <br /> (24-48 hour notice required) <br /> 7. House Heating Test Record must be submitted before finaL R��+����� <br /> TYPE OF PERMIT <br /> (Check All That A 1 ) <br /> 0 Residential ❑ Commercial(Approval Required) <br /> 0 New ❑ Additional ❑ Repairs ❑ Replace <br /> Job Site/ Owner Information: <br /> site adaress: 2975 Casco Point Road <br /> owner: Neil & Barbara Goodwin Mailing Address: 7310 Kurvers Pt Rd <br /> c,ty: Chanhassen Z;p: 55317 <br /> Home Phone: Alternate Phone: <br /> Contractor Information: <br /> UMR Geothermal, ���. Sara Pippel <br /> Contractor: Contact Person: <br /> Address: 5115 Industrial St State Bond #: MB00327�J <br /> City: Maple Plain Zlp.55359 Expiration Date: 09�� 7�ZO� 4 <br /> Phone: (763� 479-6325 Alternate Phone: <br /> � Insurance —Current: 8/1/14 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.