My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re sewer connection chg
Orono
>
Property Files
>
Street Address
>
C
>
Casco Point Road
>
2967 Casco Point Road - 20-117-23-31-0064
>
Correspondence
>
Re sewer connection chg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:57:12 PM
Creation date
3/29/2016 1:23:12 PM
Metadata
Fields
Template:
x Address Old
House Number
2967
Street Name
Casco Point
Street Type
Road
Address
2967 Casco Point Road
Document Type
Correspondence
PIN
2011723310064
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-'�� ����`7 �a4�co �`%�`'� <br /> Mike Gaffron <br /> From: Mike Gaffron <br /> Sent: Tuesday, June 15, 2010 1:45 PM <br /> To: Ron Olson; Scott Oberaigner <br /> Cc: Melanie Curtis; Lyle Oman; Jessica Loftus <br /> Subject: 2965/2967 Casco Sewer Connection - No Connection Charge Required <br /> In answer to Scott's question as to whether any Connection Charges are due to separate the sewer connections for <br /> these two properties: <br /> The short answer is, no connection charge is required. <br /> The two homes were on one lot when sewer was brought to Casco Point in 1965. The property was assessed for sewer <br /> via Levy 4048. That Levy was based on front footage only, at$49.65 per front foot, and each unit to be connected was <br /> additionally charged a Plant Charge of$225 via Levy 4049 to pay for the sewer plant on Old Crystal Bay Road. One plant <br /> charge was assessed to the property although it is likely that both houses were connected to the sewer at the same <br /> time, but into one stub. <br /> A subdivision was approved by the City in 1978 to place each of the two homes on its own parcel. At that time, rather <br /> than assess a second Plant Charge,the Council in Subdivision Approval Resolution No. 870 adopted January 23, 1978 <br /> conditioned approval on "Outstanding special assessments will be evenly divided between Tracts A& B". I read this to <br /> mean that there was no additional connection charge required then, and that none should be required today. <br /> (As an aside,The City continued to collect the $225 Plant Charge for new connections until 2003, when it was concluded <br /> it was ludicrous to be collecting a charge for a sewer plant that was taken out of service in 1981.) <br /> Michael P.Gaffron <br /> Assistant City Administrator/Long Term Strategy <br /> City of Orono <br /> (Street Address)2750 Kelley Parkway <br /> (Mailing Address) P.O. Box 66,Crystal Bay,MN 55323 <br /> Phone:(952)249-4600 <br /> Fax: (952)249-4616 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.