Laserfiche WebLink
ER�SION CONTROL PLAN <br /> 2933 Casco Point Road <br /> Orano, MN <br /> Aftached Documents <br /> 1. Erosion Control Plan. <br /> 2. Existing Site Plan. <br /> 3. Proposed Site Plan indicating areas of erosion control. <br /> 4. Silt Fence details from the Metropolitan Council. <br /> 5. Mulches, Blankets and Mat description form the Metropolitan Council. <br /> 6. Detailed project specific schedule indicating erosion control implementation and <br /> removal dates. <br /> Silt Fence <br /> Locations: Install silt fence at north, soutli property lines and east and west ends of <br /> Zone 2. <br /> TypQ; Preassembled. <br /> Installation: Trench in 6" and install per attached details from Metropolitan Council <br /> manual. <br /> Removal: Removal of silt fence shall not be removed until the District has <br /> determined that the site has been pennanently stabilized and shall be <br /> removed 30 days thereafter. <br /> Maintenance: Inspect silt fence at least once a week and after each rainfall. Make any <br /> required repairs immediately. Should silt fence collapse, tear or become <br /> ineffective, replace within 24 hours of discovery. <br /> General Notes <br /> 1. All compacted soil shall be broken up to a depth of at least 6"prior to <br /> landscaping. <br /> 2. At least 4"of topsoil shall be spread during the final site landscaping wherever <br /> topsoil has been removed. <br /> 3. Erosion control to be installed prior to any site work. See attached project <br /> schedule for detailed dates for erosion control installation and r�moval. <br />