Laserfiche WebLink
� ' - � <br /> _ --� " I ��� �'� <br /> � �o�. 2335 Highway 36 W <br /> �/I Iil� St.Paul,MN 55113 <br /> � W� �� <br /> Te1651-636-4600 <br /> Fax 651-636-1311 <br /> www.bonestroo.com <br /> May 28, zoo9 � Bonestroo <br /> Melanie Curtis <br /> Planning &Zoning Coordinator <br /> City of Orono <br /> Post Office Box 66 <br /> Crystal Bay, MN 55323 <br /> Re: 2933 Casco Point Road <br /> File No. 000139-09000-2 <br /> Building Permit No. 2009-00223 <br /> Dear Melanie: <br /> We have reviewed the grading plan dated 4-6-09 and revised 5-13-09 for 2933 Casco Point Road. <br /> Our review includes a compliance check for Chapter 79 of Orono's Land Use Code and review of <br /> the submitted erosion and sediment control information. We have the following comments: <br /> • The grading plan as submitted is acceptable from an engineering standpoint. <br /> • We understand that additional work may be proposed on the retaining walls and <br /> stairs near the lake. If this work is to occur, additional submittals and review will be <br /> required. <br /> • Orono's applicable erosion and sediment control code section is 79-7(c)(2) for fill or <br /> excavation of more than 100 cubic yards. <br /> • To bring this submittal in to compliance with the ordinance, the following information <br /> should be provided separately or on the grading plan. <br /> o Standard details sheets of applicable erosion control measures <br /> o Written specifications for land disturbance activities such as product <br /> descriptions, installation and maintenance procedures. <br /> o Temporary erosion and sediment control plan: Indicate the location of <br /> construction fence, temporary sedimentation basins, inlet protection, location <br /> of construction waste control (dumpsters, chemical storage, concrete <br /> washout, portable restroom facilities, etc.) and all other required temporary <br /> erosion and sediment control measures as described in section 79-9. This <br /> plan shall also indicate staging of temporary erosion control measures. <br /> o Provide person(s) responsible for inspection and maintenance of site erosion <br /> and sediment control including contact information, project phasing, <br /> schedules, along with the timing, installation and maintenance of erosion and <br /> sediment control measures and specifications necessary to carry out the <br /> project. <br />