Laserfiche WebLink
Feb 15 11 12:17p Norling Landscapes 9524711181 p.3 <br /> City af aro�o <br /> Zanin� Permit Ap lication <br /> Mailing Address: Permit numbe�: D/�—:L�b.'�C' <br /> � �Q,Q� PO Box 66 Oate received: o� f,� � � � <br /> �Y O 1 Cryshal Bay,MN 55323-OD6G <br /> Escrow amount: <br /> Stre�f Addr�ss' <br /> � `' s{ I Permit Fee: . <br /> � �, I 2750 Kelley Parlcway , <br /> � �'�' Orono,MN 55356 Approved by; <br /> ��s��¢� Fax: 352-249-4616 ^ Notes: <br /> Main: 952-249�600 ��ci.orono.mn.us <br /> This appfication form must be compEeted in Full and alf required irrFormation must be submitted. (Please print.) <br /> GEN�RAL INFORMAT�ON: <br /> Job Site Ac�dress: �4'�Q��� �,� • ���� j� 5'S�j <br /> COt�FTRACTOR/APPLICA�IT INFORMATION: <br /> Name:' S S �d t <br /> Phone: _ Fax: �� I <br /> Address: Cit : ZIP: <br /> Contac#Persqn: ��'O2[,� /���[i'i1LL Contact's phone number p <br /> Email (°�j (� /vp�) ��yy�}�4pplicanfis: Contra � omeow �ciruao�a� <br /> o c.� .N�' <br /> PROPERTY OWNER INFORMATION: <br /> Name: f S <br /> Phone(day): / ��j <br /> Mailing Address: ZiP: f <br /> Email andlor Fax <br /> Overafl Project Description: � <br /> Check TYpE OF PERMIT <br /> Box COST <br /> Residential Dock— Permanent dock on any lake or initial seasonal dock not on $30 +engineering review <br /> Lake Minnetonka ermanent dnck re uires CUP costs <br /> Gommercial�ock $50+engineering review <br /> costs <br /> Escrow for erosion control a�ci en ineerin review cosEs $2 ODO <br /> Minor Land Akteration(grading,filling or excavating) —500 or fess cubic yards $50+engineering review <br /> outside of lakeshore setback or less than 1�yards in lakeshore setback c�sts <br /> Escrow for erosian control and en ineerin review costs S2,040 <br /> Major Land AlteratFon (gradins, filling, or excavating)more 500 cubic yards or �30 <br /> more than 10 cubic yards in lakes#�ore setback (also requires CUP) <br /> Escrow For erosion controi and en ineerin review costs As determined b CUP <br /> Stairway to Lake $50+engineering review <br /> costs <br /> Escrow for erosion control and en ineerin review costs $2,000 <br /> Retaining Wa{I �at requiring a bt�ilding perm�t(A building permit is required for any �5p+ engineering review <br /> retaining walf ihat measures more t#ian four feet from bottom of footings to top of casts <br /> wall. Tiered retainfng walls are considered one wall unfess the walls are separated <br /> by twice the he�gf�t of tf�e lower wall.) <br /> Escrow for erosion contr�l and en ineerin review costs $2,500 <br /> Tree Removal or interisive ve etation removal in 0 to 75 footzone [Vo cha e. <br /> Structure Permit for other structures not requiring a building permit but reguEated $50+engirteering review <br /> by the zoning code(including, but nof limited to accessory building of less than 120 costs <br /> square feet, detached deck or platform and sport court) <br /> Escrow for erosion control and en ineerin re�iew costs $2,500 <br /> (over) <br />