Laserfiche WebLink
! � . <br /> 1. As-Built survey submittal and City approval required prior to issuance of O. 2. All retaining walls <br /> exceeding 4' in height require approval of engineered design prior to con tion/installation. <br /> 3. Rain garden must be installed and shown on as-built survey. Initial <br /> 4. Prior to the issuance of a C.O.for the home, submittal of evidence the driveway retaining walls were <br /> constructed in accordance with the plans dated 10/29/11 as designed by Criteruim-Schimnowski <br /> Engineers (MN lic#40126). Submittal of an inspection report verifying the desig assumptions are valid <br /> is required. The City does not perform this inspection function and ideally t signin ngineer will <br /> review the site and validate the assumptions made with the design. Initial <br /> NOTE: As built survey required prior to Certificate of Occupancy issuance. Initial: <br /> NOTE: Be aware, in the event weather or other conditions prevent the completion of an as-built survey <br /> at the time the Certificate of ccupancy is requested, a temporary Certificate of Occupancy may be <br /> issued upon receipt of a 0 escrow to ensure completion of the as-built survey and all site <br /> improvements. Initial: <br /> 3095 Casco Pt Rd <br /> 2011-01191 <br />