My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-2016 Council Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
2010-2019
>
2016
>
02-22-2016 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2016 8:59:52 AM
Creation date
3/17/2016 8:59:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, February 22, 2016 <br />7:00 o'clock p.m. <br />*4. SUPPORT FOR THREE RIVERS PARK DISTRICT GRANT REQUESTS — <br />RESOLUTION NO. 6587 and 6593 <br />Levang moved, Printup seconded, to adopt RESOLUTION NOS. 6587 and 6593, Resolutions of <br />Support for the Dakota Rail Regional Trail Hennepin County Bikeway Grant Request. VOTE: <br />Ayes 4, Nays 0. <br />*5. SEASONAL LOAD RESTRICTIONS — RESOLUTION NO. 6588 <br />Levang moved, Printup seconded, to adopt RESOLUTION NO. 6588, a Resolution Establishing <br />Seasonal Weight Restrictions on Orono Public City Streets. VOTE: Ayes 4, days 0. <br />*6. NORTHERN tiTILITIES BUILDOUT ENGINEERING <br />Levang moved, Printup seconded, to approve an engineering proposal from Bolton & Menk in an <br />amount not to exceed $149,500 to commence upon the receipt of an escrow from Lake West, LLC, <br />in the amount of $47,369 for the design and engineering of the sewer and water main extensions <br />along CSAH1121Wayzata Boulevard. VOTE: Ayes 4, Nays 0. <br />*7. WATERTOWN ROAD PHASE 2 <br />Levang moved, Printup seconded, to authorize the solicitation of bids for Phase 2 of the Watertown <br />Road street project. VOTE: Ayes 4, Nays 0. <br />8. RE -ROOFING OF SALT SHED ROOF (2700 KELLEY PARKWAY) AND NAVARRE <br />WATER TREATMENT PLANT GARAGE ROOF (2345 BLAINE AVENUE) <br />Edwards stated there are two City structures that need re -roofing. Both buildings are experiencing shingle <br />failures due to curling shingles. The salt shed is a three -sided building located by Public Works where the <br />salt and sand is stored for winter maintenance. The treatment plant garage is located next to the water <br />treatment plant in Navarre. That facility is used to store equipment that is used in Navarre as well as the <br />portable backup generators for the lift station, <br />Edwards stated the current shingles on both buildings are past their life expectancy and need replacement. <br />Both are organic shingles which proved not to be a good idea since they do not hold up and tend to curl. <br />Edwards displayed a couple of the curling shingles to the Council. <br />Edwards stated quotes have been received from a number of roofers. The low quote was from GC <br />Builders for a total of $10,562. The City had originally scheduled in the CIP $10,000 for those roofs. In <br />the CIP, the Navarre garage is a combination of roofing and painting but quotes have not been received <br />for the painting. <br />Walsh noted one more bid was received today and that there were a total of four bids. <br />Edwards stated when he reached out to Council Member Walsh, it was his understanding that he wanted <br />to check the condition of the roofs and confirm whether they needed to be replaced. <br />Page 4 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.