My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Correspondence re deck
Orono
>
Property Files
>
Street Address
>
C
>
Casco Point Road
>
2773 Casco Point Road - 20-117-23-23-0018
>
Correspondence
>
Correspondence re deck
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:53:37 PM
Creation date
3/15/2016 12:20:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2773
Street Name
Casco Point
Street Type
Road
Address
2773 Casco Point Road
Document Type
Correspondence
PIN
2011723230018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ � �� �� <br /> �O � 4��;, <br /> ;� �-=��:�=��T� ��� C ITY of OR4N0 <br /> ,'��. � <br /> ,;� ,� �� �l ,..����"--_� '�"'I� <br /> �,� �.� � ` ��� �� llunicipal Offices <br /> � ���,. �_� <br /> \� ���I��,!-�7��'����'',�G Street Address: Mailing Address: <br /> \�`9.FfESKpg'� 2750 Keliey Parkway P.O. Box 66 � <br /> ��� Orono,� MN 55356 Crystal Bay, MN 55323-a066 <br /> August 24, 1994 <br /> Mr. and Mrs. Kenneth Ericson <br /> 2773 Casco Point Road <br /> Wayzata, Minnesota 55391 <br /> Re: Deck Construction <br /> Dear Mr. and Mrs. Ericson: <br /> The City is in receipt of your after-the-fact building permit application to rebuild an existing <br /> deck. The City understands the need to repair and replace structures as they become dilapidated. <br /> The City requires a building permit for such work to verify that the work meets setbacks to <br /> property lines and hardcover regulations. When a structure is removed the City feels that if it <br /> is to be reconstructed then now is the time to require it to meet setbacks and hardcover <br /> requirements. The City also wants to verify that it meets the requirements of the building code <br /> to ensure structural stability by regulating construction methods and materials. <br /> Therefore as we discussed on the phone, you are required to submit two sets of building plans, <br /> a hardcover survey and a certificate of survey showing the location of the new deck. A deadline <br /> of September 8, 1994 has been established. If this deadline is not met, the City may initiate <br /> legal action. <br /> Sincerely, <br /> � ��� <br /> L Oman <br /> Building Official <br /> LO/ch <br /> cc: Bruce L. Va;�g, Pield Inspector <br /> Jeanne A. �ab�.�sth, Building & Zoning Adm. <br /> Telephone (612) 473-7357 • FAX 473-0510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.