Laserfiche WebLink
� REScheck Software Version 4.2.0 <br /> REScheck Inspection Checklist <br /> Plan Review and Inspection Issues <br /> This list of items may be helpful for Plan Reviewers and Buildi�g Inspectors to use as a guide for enforcing the Minnesota Energy Code.The <br /> items apply to Group R,Division 3 Occupanaes,one-and two-family residential dwellings.The items marked with'appty only to detached <br /> one-and two-family residential dwellings. <br /> Plan Review Issues <br /> Foundation Inspection: <br /> � Foundation wall insulation R-5 minimum. <br /> � Foundation insulation extends from top of wall down to top of the footlng. <br /> 0 E�erior foundation insulation is covered by a protective coating finish. <br /> Concrete Slab or UnderSlab Inspection: <br /> � Slab on grade perimeter insulatron R-5 minimum. <br /> � Slab insulation extends from top of sla6 to design frost line or top of footing. <br /> � Floors over unheated space R-30 minimum. <br /> Windows/Doors/Skylights: <br /> � Average U-value is 0.37 maximum for windows and glass doors(exdudes foundation windows). <br /> � Window U-values consistent with building plan and REScheck Certficate. <br /> 0 Window and door areas consistent with building plan and REScheck Certificate. <br /> Mecha�ical Ventilation Issues: <br /> � Residential mechanical ventilation system provides adequate ventitation per code requirements'. <br /> � Fumace efficiency is consistent with REScheck Certificate or building plan. <br /> � Protection against exoessive depressurization is installed per code requirements'. <br /> Envelope Insulation for Plan Review: <br /> � Interior basement insulation R-5 minimum(if no exterior insulatio�). <br /> � Ceilings with attfcs R-38 minimum or consistent with building plan and REScheck CeRificate. <br /> 0 Wall frami�g and insulation�evel is consistent with buikJing design and REScheck Certificate. <br /> Inspection Issues <br /> Concealed Insulation <br /> Framing and Sheathing: <br /> � Wind wash barrier installed at attic edge. <br /> � Exterior wall comers framed so that insulation can be installed after exterior sheathing is installed. <br /> � Intersections of interior partition walls and exterio�walls framed so that insulation can be installed between the partition and exterior <br /> sheathing after e�erior sheathi�g is installed. <br /> � Gaps between framing less tfian on�half inch are eliminated by securing framing together or are insutated at the time of assembty'. <br /> � All peneVations between conditioned and uncronditioned spaces made prior to framing inspection are sealed'. <br /> Interior Air Bamer: <br /> � All fire stops are air sealed. <br /> � Pipes,ducts,wires,equipment and flues and chimneys through the interior air barrier are sealed. <br /> � A sealed continuous interior air barrier is installed on the wartn side of the building envebpe at ceilings,walls,and floor rim joist areas'. <br /> Project TiUe: Kubalak Home Report date: 12/30/08 <br /> Data filename:C:\Bill-BayCliff Homes,LLC\New BCH-Projects-08\08016-kubalak\Energy-Calcs\kubalak1.rck Page 4 of 5 <br />