Laserfiche WebLink
. . �°�o <br /> C ITY OF ORONO <br /> .� ,�, Street Address: Mailing Address: Telephone(952)249-4600 <br /> y�r. Gti 2750 Kelley Parkway I P.O. Box 66 Fax (952)249-4616 <br /> Iq �, Orono, MN 55356 Crystal Bay,MN 55323 I www.ci.orono.mn.us <br /> kFsxo� <br /> January 14, 2015 <br /> Eric&Liz Vogstrom <br /> 2618 Casco Point Road <br /> Wayzata, MN 55391 <br /> Re: Building Permit Application#2015-00006 <br /> On lanuary 2, 2015 the City received a building permit application for an accessory structure. Staff conducted a <br /> preliminary review based on the information provided and recommends the following items be submitted or revised <br /> in order for your application to be considered complete and for the plan review to continue: <br /> 1. Certificate of Survey The City Engineer has reviewed the survey and made the following comments. Please <br /> provide two copies of an updated, full size certificate of survey which meets all of the City's survey standards <br /> (enclosed)addressing the comments below. <br /> a. The southern retaining wall has a lower top of wall elevation than bottom of wall elevation(TW=940.0; <br /> BW=941.5). <br /> b. The middle of the southern retaining wall is listed as 4 Ft(TW=945.0; BW=941.0). The northern retaining <br /> wall is shown to be 4 ft. (TW=947; BW=943&TW=946;BW=942;TW=946.5; BW=942.5) Walls 4'or <br /> greater in height must be designed by a licensed professional, and plans must be submitted to the City for <br /> review. <br /> c. The site plan/survey does not depict the drainage pattern as required by the City Survey submittal <br /> standards. <br /> d. Based on the proposed contour lines,the plan would direct surface drainage from the west of the house <br /> into the southern neighbors property via a swale. A site plan should be developed to ensure runoff is not <br /> directed into the neighboring properties. <br /> e. A silt fence or other erosion control measure is not is not depicted on the plan. A silt fence or other <br /> appropriate erosion control mechanism should be planned for and must be installed and inspected by the <br /> City prior to any land disturbing activities. The Contractor must provide a minimum 24 hour notice prior <br /> to inspection. <br /> 2. Escrow & Escrow Agreement. Permits involving grading and/or review by the City's engineer require <br /> submittal of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement <br /> to the City for out-of-pocket costs incurred during the review of your plans. Additionally this escrow will <br /> guarantee conformance with City Code Chapter 79 relating to erosion control and stormwater. The required <br /> escrow amount for this project is $2,500. The escrow agreement is enclosed. The property owner must sign <br /> the escrow agreement and submit a check for$2,500. <br /> PLEASE NOTE: 2015 NEW PERMIT REQUIREMENT: Prior to the commencement of a� exterior/landscaping <br /> improvements, i.e. patios,grading,sidewalks, retaining walls, etc., a Zoning Permit is required. <br />