Laserfiche WebLink
s <br /> ' DETERMINING PERMIT FEES <br /> � SAC Charge(2007 Rate=$1,675.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connection permit will not be issued) <br /> 35.00 <br /> �Sewer Connection/Disconnect/Repair($35.00/Per Stub) $ <br /> Pipe size � inches;material X Schd 40 air tested; � cast iron <br /> �❑Water Connection/D:sconnect/Repair(�35.00/Per Stab� $ 35.00 <br /> Pipe size � inches;material X Schd 40 air tested; copper <br /> 1. SUBTOTAL of Permit Requested: $ 70.0� <br /> 2. STATE SURCHARGE $ .50 <br /> 3. POSTAGE&HANDLING(Only on Mail-ln Applications) $ 1.50 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ 72•0� <br /> ADDITIONAL INFORMATION-WATER METERS <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a separate permit. <br /> ■ WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota,and certifies that all statements made on this application are,true and correct. <br /> � <br /> Applicant: Date: � � <br /> Reset Form <br /> I'� <br />