Laserfiche WebLink
DETERMINING PERMIT FEES <br /> � SAC Charge(2007 Rate=$1,675.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connection permit will not be issued) <br /> _—� <br /> � Sewer Connec 'on ' nec Repair($35.00/Per Stub) $ <br /> Pipe size�inches;material Schd 40 air tested; � cast iron <br /> ❑ Water Con ction � ect/Repair($35.00/Per Stub) $ <br /> Pipe size�inches;material Schd 40 air tested; 0 copper <br /> 1. SLJBTOTAL of Permit Requested: $ <br /> 2. STATE SURCHARGE $ .50 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 1.50 <br /> 4. TOTAL PERMTT FEE(Add Lines 1-3 Above) $ <br /> ADDITIONAL INFORMATION -WATER METERS <br /> • WATER METERS must be picked up and paid for at Orono City Hall,these are on a separate permit. <br /> ■ WATER METERS must be set and sealed by Orono V1'ater Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all wark in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statements made on th' a�plication are, true and correct. <br /> y <br /> Applicant: ' �� - _ Date: � ���' � � <br /> Reset Form <br />