Laserfiche WebLink
PLAN REVIEW �HECKLIST FOR NEW STRUCTURES / 14DDITiO�NS <br /> Address: ���� �e�.�� � ��� PermitNo.: ��.�j' -�'��,� <br /> Description of work: � ; �(,�'(���f Date Rec'd: �� • ��� � <br /> .� <br /> Septic review by: � � Y V t�1 � Date Approved: <br /> Zoning review by: Date Approved: <br /> Building review by: � � Date Approved: �� � Z� � <br /> , �.-..� <br /> Grading reviewr by: ��- Date Approved: `�/���%l�A���-- <br /> Zoning District: �� �� Zoning File#: Reso#: Reso Date: <br /> � <br /> ; Zoning: Lot Area: � �... �AC Width:� Lot Coverage: SF �• % <br /> � Survey Submitted: �es Q No Date of Survey: Eo'� '�� Revised date(?): ` <br /> Landscape plan submitted? ❑ Yes Q No Landscaper: � � " <br /> Pro�osed Setbacks: <br /> � , <br /> Front( �) Rear(S�f�� ( N S E W )O ( N S E 1�� Other Buildings� VNetland <br /> � <br /> Si� Side <br /> �° ��� ° r.�3.�� �(°�� <br /> Defined Height: Peak Height: _ FFE �� � F.FE minu� 6 feet=`� (Existing Contour) <br /> Perimeter(linear feet) = 50% = L.F. b�Eowr gsade <br /> Basement? [3 Yes 0 No, Stories <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FQR A BUILDING ON A SLAB FOUNDATION: <br /> The distance between the lowest proposed Slab at or above grade— <br /> START W ITH floor(of the basement or crawl space)and measure from hiqhest existina <br /> the highest point of the roof. START WITH r4 ade to the highest point�e <br /> roof even if fill was brpug th in to <br /> If you have a... elevate home. �°�` <br /> ,�' <br /> SUBTRACTION • GABLE OR HIPPED ROOF(no Slab beloy�r'g'rade—measure <br /> (BASED ON windows): Subtract half the distance from hi�fest existing grade to the <br /> ROOF TYPE) between the highest point of the roof hi h�st oint of the roof. <br /> to the low point of the corresponding If you have a., <br /> gable or hipped roof SUBTRACTION ' GABLE OR HIPPED ROOF <br /> • GABLE OR HIPPED ROOF(with (BASED ON (no windows): Subtract haH <br /> windows): Subtract half the distance ROOF TYPE)" the distance between the <br /> between the top of the highest highest point of the roof to <br /> window and the highest point of the the low point of the <br /> roof corresponding gable or <br /> hipped roof <br /> • ALL OTHER ROOF TYPES(flat, • GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Subtract the distance between the y half the distance between <br /> (BASED ON basemenUcrawl space floor and the the top of the highest <br /> F EXISTING highest existing grade adjacent to the i% window and the highest <br /> ; � ; , GRADES) foundation OR 10 feet(whichever is less). � point of the roof <br /> � o ALL OTHER ROOF TYPES <br /> ���, (flat,mansard,etc):No <br /> EQUALS Defined building height 9 subtraction. <br /> Defined building height <br /> EQUALS <br /> Updated: October 2015 <br /> z:lforms\plan review checklist 10-2015.docx <br />