My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5651
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7499
>
Reso 5600 - 5699 (April 25, 2007 - December 3, 2007)
>
Resolution 5651
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2015 7:42:06 AM
Creation date
2/25/2016 1:38:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY of ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 56 5 1' <br />6. In conjunction with the proposed relocation of Bracketts Point Road, the vacation <br />of said right-of-way will not eliminate access to any adjoining or nearby <br />properties. <br />7. Utility companies have been notified of the proposed vacations and they have <br />indicated they do not oppose the vacations as long as their respective existing <br />utility lines are relocated to the relocated Bracketts Point Road and the Developer <br />bears all costs of relocating such utilities. The Developer has agreed to this <br />condition as documented in the Developers Agreement dated <br />8. While municipal sewer lines exist within the right-of-way and easements to be <br />vacated, in conjunction with the relocation of Brackets Point Road the Developer <br />has committed to bear the costs of relocating said lines to the relocated Bracketts <br />Point Road. <br />9. The City does not intend to use the portion of right-of-way to be vacated for any <br />public purpose. <br />10. The City has received a letter of support for the vacation from the owners of the <br />adjacent property served by the existing road. <br />11. Vacation of the public road and its associated. drainage and utility easements, and <br />relocation of the existing utilities within the vacated corridor, will provide <br />proposed Lot 1 with a lakeshore yard that is not encumbered by easements. <br />12. The proposed plat and road relocation will remove significant amounts of <br />hardcover from the 0-75' lakeshore setback zone where no hardcover is normally <br />allowed, and relocate it to the 75-250' zone where its runoff impacts are reduced. <br />NOW, THEREFORE, BE IT RESOLVED, that the petition of the Developer is <br />hereby granted by the City Council of the City of Orono and that the portion of right-of-way and <br />drainage and utility easements as legally described above are hereby vacated, subject to the <br />following: <br />1. This vacation approval shall not be effective until such time that Developer has entered <br />into a Developers Agreement with the City of Orono for relocation of Bracketts Point <br />Road and its associated utilities. This vacation approval is valid only in conjunction with <br />the subsequent recording of the plat of BRACKETTS POINT 21'o ADDITION with <br />Hennepin County. <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.