My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-2016 Council Packet
Orono
>
City Council
>
2016
>
02-22-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 11:09:01 AM
Creation date
2/25/2016 11:05:23 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br /> <br /> <br /> <br />DATE: February 22, 2016 <br /> ITEM NO: 9 <br />____________________________________________________________________________________________ <br />Department Approval: Administrator Reviewed: Agenda Section: <br />Name Adam Edwards JML Public Works Director/ <br />Title Public Works Director/City Engineer City Engineer’s Report <br />____________________________________________________________________________________ <br />Item Description: Approve Rehabilitation of Lift Station 24 (3982 Dahl Rd) and Grinder Station 6 (1446 <br />Shoreline Dr) <br />_____________________________________________________________________________ <br /> <br />List of Exhibits <br />A. Bid Tabulation. <br /> <br />1. Purpose. The purpose of this action item is to gain approval to proceed with Lift/Grinder <br />Station Rehabilitation projects for 2016. <br /> <br />2. Background. The Sewer Department has developed a maintenance plan for the 46 <br />lift/grinder stations that are part of the sewer system. As part of the plan, each station is <br />inspected annually to identify routine maintenance needs. In addition to routine maintenance, <br />the plan also includes the upgrade of two lift stations per year. The lift stations that are <br />upgraded are selected based on a number of factors: age, maintenance records, issues <br />discovered during the annual inspection and the risks associated with the failure of the lift <br />station. Lift Station 24 (3982 Dahl Rd) was reconstructed in 1973 and Grinder Station 6 <br />(1446 Shoreline Dr) was constructed in 1980 and both lift/grinder stations surpassed their life <br />expectancy. Maintenance costs are increasing due to their age and the outdated technology of <br />the controls and pumps. <br /> <br />3. Project Scope. Installation of new control panels, two new pumps per station, discharge piping <br />and all electrical work. <br /> <br />4. Cost. The lowest quote from a qualified contractor was $68,230 from Quality Flow Systems Inc. <br />Quality Flow Systems Inc. <br /> <br />5. Funding. This project will be funded through the Sanitary Sewer Enterprise Fund. <br />Project Fund CIP Budget Proj Fund Yr End Balance <br />LS 24 Sewer Fund $ 53,000.00 $ 1,704,972.00 <br />GS 6 Sewer Fund $ 53,000.00 $ 1,704,972.00 <br /> <br />COUNCIL ACTION REQUESTED <br /> <br />Consider a motion to accept the quote in the amount of $68,230.00 from Quality Flow Systems <br />Inc for the upgrade of LS 24 and GS 6
The URL can be used to link to this page
Your browser does not support the video tag.