My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-2016 Council Packet
Orono
>
City Council
>
2016
>
02-22-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 11:09:01 AM
Creation date
2/25/2016 11:05:23 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> REQUEST FOR COUNCIL ACTION <br /> <br />DATE: February 22, 2016 <br />ITEM NO.: 8 <br />______________________________________________________________________________ <br />Department Approval: Administrator Reviewed: Agenda Section: <br />Name Scott Oberaigner JML Public Works Director/ <br />Title Public Works Supervisor City Engineer’s Report <br />______________________________________________________________________________ <br />Item Description: Re-roofing of Salt Shed Roof (2700 Kelley Parkway) and Navarre Water <br />Treatment Plant Garage Roof (2345 Blaine Ave.) <br />______________________________________________________________________________ <br /> <br />List of Exhibits <br />A. Bid Tabulation. <br /> <br />1. Purpose. The purpose of this action item is to gain approval to proceed with re-roofing the <br />salt shed and Navarre garage roofs. <br /> <br />2. Background. Both buildings are experiencing shingle failures due to curling shingles. The <br />shingles that were applied to both roofs are organic shingles and are past the life expectancy and <br />need replacement. The Navarre Water Treatment Plant garage roof was installed in 1984. The <br />salt shed roof was last re-shingled in 1998. <br /> <br />3. Project Scope. On both structures- tear off and dispose of old shingles, apply ice and water as <br />needed, apply 15# felt to rest of roof, and apply shingles. <br /> <br />4. Cost. The lowest quote from a qualified contractor was $10,562.00 from GC Builders. <br /> <br />5. Funding. The projects are budgeted in the CIP against the Improvement/Equipment Outlay <br />Fund for the salt shed roof and Sewer Fund to pay for the Navarre Water Treatment Plant roof. <br />Project Fund CIP Budget Proj Fund Yr End Balance <br />Salt Shed roof Improvement/Equipment Outlay <br />fund $ 10,000.00 $ 510,137.00 <br />Navarre Garrage Sewer Fund $ 10,000.00 $ 1,704,972.00 <br /> <br />COUNCIL ACTION REQUESTED <br />Consider a motion to accept the quotation in the amount of $10,562.00 from GC Builders for <br />reroofing of salt shed roof and Navarre Water Treatment Plant Garage roof. <br />
The URL can be used to link to this page
Your browser does not support the video tag.