My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/10/2009- email re drainage problem
Orono
>
Property Files
>
Street Address
>
C
>
Casco Circle
>
3125 Casco Circle - 20-117-23-34-0021
>
Correspondence
>
08/10/2009- email re drainage problem
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:58:42 PM
Creation date
2/23/2016 1:04:56 PM
Metadata
Fields
Template:
x Address Old
House Number
3125
Street Name
Casco
Street Type
Circle
Address
3125 Casco Circle
Document Type
Correspondence
PIN
2011723340021
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> Melanie Curtis <br /> From: Kellogg, Tom P [Tom.Kellogg@bonestroo.com] <br /> Sent: Tuesday, August 25, 2009 3:23 PM <br /> To: Melanie Curtis <br /> Subject: FW: Drainage Problem.....Again <br /> Attachments: image001.jpg; Water run off from Freds property Pictures Taken Monday August 24 2009.doc <br /> Tom Kellogg, PE <br /> Associate <br /> Tel 651-604-4863 <br /> Cel I 651-775-5637 <br /> tom.kellogg@bonestroo.com <br /> � Bonestroo <br /> From: Ronald G Dudley [mailto:ron_dudley@biz-transformations.com] <br /> Sent: Monday, August 24, 2009 7:59 PM <br /> To: Eric Wischmann; Sven Gustafson <br /> Cc: 'Evelyn Turner'; Kellogg, Tom P; 'Fred C. Peters' <br /> Subject: RE: Drainage Problem.....Again <br /> Sven......Thank you for having the mud shoveled away. I am guessing they needed to let the flagstone dry <br /> before they can sweep up the surface dirt that was left from the shoveling. <br /> What time tomorrow will the sweeping be done? <br /> I am still puzzled as to why so much dirt has been piled between the patio and the garage being constructed. <br /> Your plan calls for the elevation of the swale to at the same elevation as the patio/flower bed components. There <br /> is considerably more dirt so that the dirt is elevated to a level above the patio and has no where to go in a rain <br /> except in the direction of the patio. Also the plan says the swale area was to be graded away from the patio so <br /> that water drains away and not toward the patio as is now the case. If eventually the plan is followed, why all <br /> the extra dirt piled up now? <br /> The temporary "fix" that was done today was to place some 4x8 plywood in an attempt to catch the dirt as it <br /> runs toward the patio. I am skeptical that this will work and am scratching my head as to why leave all the extra <br /> dirt in a position that it has to be "caught"? Why can't the dirt just be removed now if it has to be graded to the <br /> patio/flowerbed elevations when the construction is finished. <br /> See the attached photos. <br /> Sincerely yours <br /> Ron Dudley <br /> 3125 Casco Circle <br /> Orono, MN 55391 <br /> --- On Mon, 8/24/09, Sven Gustafson <sven@stonewood.com>wrote: <br /> From: Sven Gustafson<sven@stonewood.com> <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.