Laserfiche WebLink
One of your sub-contractors, Concrete Science, did replace a section of the lattice they damage with their <br /> digging equipment but the supporting post was also loosened by the encounter with the equipment but cannot be <br /> fixed until the "end capping" is complete. Can you tell me when the "end capping" will occur so the support <br /> post can be secured? <br /> I would asked: "what is the plan to correct the situation so that I am not having to deal with mud flowing onto <br /> the patio and into my drain and how soon wii that plan be effected?" <br /> An e-mail reply would be appreciated. <br /> Sincerely. <br /> Ron Dudley <br /> 3125 Casco Circle <br /> Orono, MN 55397 <br /> z <br />