My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010233 (demo)
Orono
>
Property Files
>
Street Address
>
C
>
Casco Avenue
>
3753 Casco Avenue - 20-117-23-31-0009
>
Permits/Inspections
>
1998-010233 (demo)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:55:45 PM
Creation date
2/22/2016 2:41:54 PM
Metadata
Fields
Template:
x Address Old
House Number
3753
Street Name
Casco
Street Type
Avenue
Address
3753 Casco Avenue
Document Type
Permits/Inspections
PIN
2011723310009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> . APPLICATIOi�' FOR DEMOLITION PER�tiiIT <br /> CITY OF ORO�'O . <br /> P.O. Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 5�323 <br /> SPECL4L CONDITIONS & HOLD HARi�1I.ESS AGREEI�i\'�' <br /> General Instructions <br /> 1. You may be required to obtain other permits, i,e. burnin�, well abandonmuient, etc. <br /> 2. tiVork must not be�in unless the permit card is available on the job site. <br /> 3. A 24 hour notice is required for all inspections. Call 473-7357. <br /> JOB STTE ADDRESS: J��� �5 �C< <� C' � <br /> Occupancy Type: � Residential Commercial <br /> L Phone: � � <br /> oti��R�s �r,��rE: � �- � . <br /> _� . ciry: o �� <br /> Mailin� rlddress: / C <br /> CQNTRACTOR'S NA12E: �C' /� Bus. No.: <br /> Mailing Address: Clry: <br /> Demolition if planned by means of: manual disassembly <br /> —�heavy equipment <br /> � burnin� (by fire department) <br /> Permits Issued: <br /> # Burning Fire Department <br /> ## Well Abandonmen[ <br /> In return for issuance of said Demolition Permit, the undersi�ned owner hereby a�rees as <br /> follows: <br /> 1. The structure(s) shall be kept enclosed and/or secured until such time as demolition is <br /> complete. <br /> 2. Demolition debris will be kept off adjoinin' property andlor the public rights-of-way <br /> unless specific prior approval is obtained in writi.n� for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4, All demolicion debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. <br /> 5, Water wells must be abandoned in accordance with State Health Department regulations. <br /> 6. Inspection required when all debris has been removed, before backfillin�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.