My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01271 (residential - accesory structure)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4565 Bayside Road - 06-117-23-21-0010 - New PID
>
Permits/Inspections
>
2015-01271 (residential - accesory structure)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:24:43 PM
Creation date
2/19/2016 4:18:17 PM
Metadata
Fields
Template:
x Address Old
House Number
4565
Street Name
Bayside
Street Type
Road
Address
4565 Bayside Rd
Document Type
Permits/Inspections
PIN
0611723210010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, Builder Acknowledgement Form <br /> 4565 Bayside Road / #2015-01271 <br /> Builder <br /> Permit Conditions Initials <br /> At the December 14, 2015 the Council granted a variance for the accessory <br /> structure. They stated the building permit could be issued prior to the resolution Q �, <br /> being approved and signed with the following conditions: ��v <br /> • A cupola and four shutters be added <br /> Schedule a minimum of one hour for the framing inspection. <br /> Erosion control mechanisms must be installed and inspected by the City proper to <br /> any land disturbing activities. The contractor must provide a minimum of a 24 ;. <br /> hour notice prior to inspection. �" <br /> Erosion control shall be installed and maintained throughout the entire project and <br /> must remain until vegetation has been established. ' <br /> Continue to provide protection around the alternate septic site with snow fencing � <br /> or metal stakes and caution tape. <br /> Contact the Minnehaha Creek Watershed District regarding any additional <br /> permitting required for the accessory structure. <br /> Prior to the issuance of a Certificate of Occupancy for the new principal structure t <br /> currently under construction an as-built survey must be submitted and approved. <br /> In the event of winter or other unfavorable weather conditions (which prevent the <br /> completion of the exterior improvements and/or as-built survey) a Temporary <br /> Certificate of Occupancy(TCO) may be necessary for the new principal structure , ,�\ <br /> currently under construction. A TCO requires a $10,000 escrow. �� <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios,grading, <br /> sidewalks, retaining walls, etc. not currently shown on the approved survey and <br /> landscaping plan will require a separate Zoning Permit application to be submitted � <br /> and approved prior to the work commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by <br /> twice of the height of the lower wall require engineered plans and a building � <br /> permit to be submitted and approved prior to construction. <br /> W:\Street Files\Bayside Road\4565\Builder Acknowledgement Form 2015-01271.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.