My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01330 (septic)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4565 Bayside Road - 06-117-23-21-0010 - New PID
>
Septic
>
2015-01330 (septic)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:24:43 PM
Creation date
2/19/2016 4:11:40 PM
Metadata
Fields
Template:
x Address Old
House Number
4565
Street Name
Bayside
Street Type
Road
Address
4565 Bayside Rd
Document Type
Septic
PIN
0611723210010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' � � <br /> � <br /> OSTP Mound Materials Worksheet UNIVERSITY , <br /> Minnesota Pallution OF MINNESOTA '���' <br /> Control Agency "��=� <br /> Projectl : v 06.12.13 <br /> A. Calculate Bed (rock)Vo(ume:8ed Length (2.0 X Bed Width 2.6)X Depth =Volume ft' <br /> 22.0 ft X 10.0 ft X 1.0 = 220.0 ft3 <br /> Divide ft'by 27 ft'/yd'to calculate cubic ards: <br /> 220.0 ft' = 27 = 8.1 yd3 <br /> Add 20%for constructability: g,1 yd'X 1_2 = q,g yd3 <br /> B. Catculate Cleon Sond Volume: <br /> Volume Under Rock bed:Average Sand Depth x Media Width x Medio Length =cubic feet <br /> 1.3 ft X 10.0 ft X 22.0 ft = 286.0 ft3 <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> ft -1) X X ft = <br /> Volume from Width_((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X X ft = <br /> Total Clean Sand Volume: Volume from Length+Volume from Width+Vo(ume Under Media <br /> ft' + ft' + ft3 = ft' <br /> For a Mound on a slope greater than 1% <br /> Upslope Volume:((Upslope Mound Height - 1)x 3 x Bed Length)�2=cubic feet <br /> (( 3.0 ft -1) X 3.0 ft X 22.0 )+2- 66.0 ft' <br /> Downslope Volume:((Downslope Height- 1) x Downstope Absorption Width x Media Length)�2=cubic feet <br /> (( 3.6 ft-1) X 14.O�f[ X 22.0 )+Z- 400.4 qt' <br /> Endslope Volume: (Downs(ope Mound Height- 1) x 3 x Media Width =cubic feet <br /> ( 3.6 ft-1 ) X 3.0 ft X 10.0 ft = 78.0 ft' <br /> Tota!Clean Sand Volume:Upslope Volume +Downs(ope Vo(ume +Ends(ope Volume +Vo(ume Under Media <br /> 66.0 ft' + 400.4 ft3 + 78.0 {t' + 286.0 {t3- 830.4 ft3 <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 830.4 ft' = 27 = 30.8 yd3 <br /> Add 20%for constructability: 30.8 yd3 X 1.2 = 36.9 yd3 <br /> C. Calculate Sandy Berm Vo(ume: <br /> Total Berm Volume(opprox): ((Avg.Mound Height-0.5 ft topsoit)x Mound Width x Mound Length)*2=cubic feet <br /> ( 3.3 _ 0.5 )ft X 39.0 ft X 44.0 )=2= 2402.4 ft' <br /> Total Mound Volume-C(ean Sand volume-Rock Vofume=cubic feeY <br /> 2402.4 ft3 _ 830.4 ft' _ 220.0 ft3 - 1352.0 ft3 <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 1352.0 ft' : 27 = 50.1 yd3 <br /> Add 20%for constructability: 50.1 yd' x 1.2 = 60.1 yd' <br /> D. Calculate Topsoi(Moterial Volume:Total Mound Width X Totaf Mound Length X.5 ft <br /> 39.0 ft X 44.0 ft X 0.5 ft = 858.0 ft� <br /> Divide ft'by 27 ft;/yd'to calculate cubic yards: 858.0 ft3 � 27 = 31.g yd' <br /> Add 20%for constructability: 31.8 yd' x 1.2 = 38.1 yd' <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.