Laserfiche WebLink
o � <br /> � � <br /> � NOTES: <br /> � � � <br /> � ��0 3 1. MAIN LEVEL FLOOR SHEATHING TO BE 3/" PLYWOOD/OSB PLACED IN STAGGERED PATTERN NAILED w/0.131"0 x <br /> _ �°'� '° 3" LONG NAILS @ 6"O.C.AT PANELS EDGES&@ 12"O.C.@ PANEL INTERIOR SUPPORTS OF EQUIVALENT. <br /> � ;m Z�,� 2. NAILS IN BLOCKING ARE TO BE PLACED SUCH THAT THE WOOD DOES NOT SPLIT. <br /> D a�>�� 3. BLOCKING MEMBERS SHOWN MAY BE REPLACED WITH PRE-MANUFACTURED TRUSS STYLE OR FULL DEPTH <br /> Z 3N, s <br /> MEMBER BLOCKING SUCH AS I-JOIST OR LVL DESIGNED FOR 1,500 POUND LATERAL COMPRESSIVE LOAD. <br /> o A ao co � Z � N NAILING SHOWN IS TO BE USED AT MINIMUM. <br /> z o 0 <br /> � � � Q° � v A 4. BLOCKING DOES NOT HAVE TO BE PLACED IN ADJACENT BAYS. IF REQUIRED USE ADDITIONAL 2x4 SPACERS AS <br /> � � � � � � n SHOWN IN FIRST SPACE. <br /> � � o� 0 � m � 5. HOLES MAY BE INSTALLED IN BLOCKING IF REQUIRED UP TO 4" IN DIAMETER, MAINTAIN 3"EDGE DISTANCE. <br /> ,�; � m n o � 0 <br /> � � � � � D n <br /> m .� <br /> m <br /> � �D oZm <br /> m f2o � � m <br /> z � <br /> o � m C OPTIONAL OPEN SPACE AS SHOWN OR <br /> � N � Z SHIFT FULL HEIGHT BLOCKING <br /> � D � AIL SHEATHING TO BLOCKING/JOIST FRAMING <br /> BY OTHERS <br /> � � � Z w/(12)0.131"0x3" LONG NAILS � � , <br /> ° 0.131 fd x 3" LONG NAILS @ 6"O.C. <br /> � � � '� I�� <br /> .. n . <br /> M � � ~ N _ _- --. - _ - - - �� -_ <br /> __ RIM TRUSS <br /> . _ _. <br /> � � o � � � BY OTHERS <br /> m �. � a ��I i <br /> �� Z o li; �� E� TYPE D CONNECTOR @ BLOCKING SEE <br /> � � � 'I S10 <br /> � � � i I !I i ti'; <br /> I i �i i� �'� 2 x 6 MIN <br /> � SILL PLATE <br /> � FOUNDATION WALL SEE OTHER SHEETS <br /> � JOISTS BY OTHERS ti ', FOR ANCHORS&WALL INFO <br /> 1 N A � PROVIDE BLOCKING � � { <br /> � " � AS REQUIRED TO ACHIEVE p o ; SLOPE GRADE AWAY FROM <br /> �/� N NAILING SHOWN. (MIN 2 �-- FOUNDATION <br /> �+ i � SPACES) o I_—I I i Tr � �-... <br /> � BLOCKING HEIGHT TO MATCH �-.�� �i I <br /> N I JOIST DEPTH & BE OF <br /> LUMBER, I-JOIST,OR OTHER SEE S11 FOR SPACING OF IF REQUIRED, PROVIDE 2 x 4 MIN <br /> MANUFACTURED MATERIAL BLOCKING SYSTEM SHOWN SPACERS UNTIL SPACES IN WHICH FULL <br /> o ATTACH BLOCKING TO JOISTS HEIGHT BLOCKING CAN BE INSTALLED, <br /> � w/TOE NAILS EACH END TOE NAIL TO FLOOR MEMBERS EACH <br /> END <br /> � <br /> m <br /> < <br />