Laserfiche WebLink
ADMINISTRATION <br /> shall proceed at the holder's own risk with the building oper- of completion of the permitted work,or as required by state or <br /> ation and without assurance that a pernut for the entire local laws. <br /> structure will be granted. <br /> 106.3.4 Design professional in responsible charge. SECTION 107 <br /> 106.3.4.1 General.When it is required that documents TEMPORARY STRUCTURES AND USES <br /> be prepared by a registered design professional, the 107.1 General. The building official is authorized to issue a <br /> building official shall be authorized to require the owner <br /> to engage and designate on the buiiding permit applica- Permit for temporary structures and temporary uses.Such per- <br /> tion a registered design professional who shall act as the �ts shall be limited as to time of service,but shall not be per- <br /> registered design professional in responsible charge. If �tted for more than 180 days. The building official is <br /> the circumstances require, the owner shall designate a authorized to grant extensions for demonstrated cause. <br /> substitute registered design professional in responsible 107.2 Conformance.Temporary structures and uses shall con- <br /> charge who shall perform the duties required of the origi- form to the structural strength, fire safety, means of egress, <br /> nal registered design professional in responsible charge. accessibility, light, ventilation and sanitary requirements of <br /> The building official shall be notified in wnting by the this code as necessary to ensure public health,safety and gen- <br /> owner if the registered design professional in responsible eral welfare. <br /> chazge is changed or is unable to continue to perform the 107.3 Temporary power.The building official is authorized to <br /> duties. give permission to temporarily supply and use power in part of <br /> The registered design professional in responsible an electric installation before such installation has been fully <br /> charge shall be responsible for reviewing and coordinat- completed and the final certificate of completion has been <br /> ing submittal documents prepared by others, including issued. The part covered by the temporary certificate shall <br /> phased and deferred submittal items, for compatibility comply with the requirements specified for temporary lighting, <br /> with the design of the building. heat or power in the ICC Electrical Code. <br /> Where structural observation is required by Section 107.4 Termination of approval. The building official is <br /> � 1709,the statement of special inspections shall name the authorized to ternunate such pernut for a temparary structure <br /> individual or fums who are to perform structural obser- or use and to order the temporary structure or use to be discon- <br /> vation and describe the stages of construction at which tinued. <br /> structural observation is to occur(see also duties speci- <br /> fied in Section 1704). <br /> 106.3.4.2 Deferred submittals.For the purposes of this SECTION 108 <br /> section,deferred submittals are defined as those portions FEES <br /> of the design that are not submitted at the time of the 108.1 Payment of fees. A pernut shall not be valid until the <br /> application and that are to be submitted to the building fees prescribed by law have been paid,nor shall an amendment <br /> official within a specified period. to a pernut be released until the additional fee,if any,has been <br /> Deferral of any submittal items shall have the prior Paid. <br /> approval of the building official. The registered design 108.2 Schedute of permit fees.On buildings,structures,elec- <br /> professional in responsible charge sha11 list the deferred trical, gas, mechanical, and plumbing systems or alterations <br /> submittals on the construction documents for review by requiring a pemut, a fee for each pernut shall be paid as <br /> the building official. required,in accordance with the schedule as established by the <br /> Documents for deferred submittal items shall be sub- applicable governing authority. <br /> mitted to the registered design professional in responsi- 108.3 Building permit valuations.The applicant for a pemut <br /> ble charge who shall review them and forward them to shall provide an estimated pemut value at time of application. <br /> the building official with a notation indicating that the Pernut valuations shall include total value of work, including <br /> deferred submittal documents have been reviewed and materials and labor,for which the pernut is being issued,such <br /> been found to be in general conformance to the design of as electrical,gas,mechanical,plumbing equipment and perma- <br /> the building. The deferred submittal items shall not be nent systems.If,in the opinion of the building official,the valu- <br /> installed until the design and submittal documents have ation is underestimated on the application, the permit shall be <br /> been approved by the building official. denied, unless the applicant can show detailed estimates to <br /> 106.4 Amended construction documents. Work shall be meet the approval of the building official.Final building permit <br /> installed in accordance with the approved construction docu- valuation shall be set by the building official. <br /> ments,and any changes made during construction that are not 108.4 Work commencing before permit issuance.Any person <br /> in compliance with the approved construction documents shall who commences any work on a building, structure, electrical, <br /> be resubmitted for approval as an amended set of construction gas,mechanical or plumbing system before obtaining the neces- <br /> documents. sary pernuts shall be subject to a fee established by the building <br /> 106.5 Retention of construction documents. One set of official that shall be in addition to the required permit fees. <br /> approved construction documents shall be retained by the 108.5 Related fees.The payment of the fee for the construc- <br /> building official for a period of not less than 180 days from date tion, alteration, removal or demolition for work done in <br /> 6 2006 INTERNATIONAL BUILDING CODE° <br />