My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/2010- Correspondence re work trailer on site/violation
Orono
>
Property Files
>
Street Address
>
C
>
Cascade Lane
>
2607 Cascade Lane - 33-118-23-11-0121
>
Correspondence
>
07/2010- Correspondence re work trailer on site/violation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:00 PM
Creation date
2/18/2016 1:23:29 PM
Metadata
Fields
Template:
x Address Old
House Number
2607
Street Name
Cascade
Street Type
Lane
Address
2607 Cascade Lane
Document Type
Correspondence
PIN
3311823110121
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADMINISTRATION <br /> shall proceed at the holder's own risk with the building oper- of completion of the pernutted work,or as required by state or <br /> ation and without assurance that a pernut for the entire local laws. <br /> structure will be granted. <br /> 106.3.4 Design professional in responsible charge. <br /> 106.3.4.1 General. When it is required that documents SECTION 107 <br /> TEMPORARY STRUCTURES AND USES <br /> be prepared by a registered desi�n professional, the <br /> buildin'official shall be authorized to require the owner 1071 General. The building official is authorized to issue a <br /> to engage and designate on the building pernut applica- Pernut for temporary structures and temporary uses.Such per- <br /> tion a registered design professional who shall act as the ��shall be limited as to time of service,but shall not be per- <br /> registered design professional in responsible charge. If �tted for more than 180 days. The building o�cial is <br /> the circumstances require, the owner shal] designate a authorized to o ant extensions for demonstrated cause. <br /> substitute registered desib professional in responsible 107.2 Conformance.Temporary structures and uses shall con- <br /> charge who shall perform the duties required of the oria- form to the structural strength, fire safery, means of eb ess, <br /> nal reb stered desib professional in responsible charge. accessibility, light, venulation and sanitary requirements of <br /> The building off:cial shall be notified in writing by the this code as necessary to ensure public health,safety and gen- <br /> owner if the registered design professional in responsible eral welfaze. <br /> charge is changed or is unable to continue to perform the 107.3 Temporary power.The building official is authorized to <br /> duties. <br /> give permission to temporarily supply and use power in part of <br /> The registered design professional in responsible an electric installation before such installation has been fully <br /> charge shall be responsible for reviewin�and coordinat- completed and the final certificate of completion has been <br /> ing submittal documents prepared by others, including issued. The part covered by the temporary certificate shall <br /> phased and deferred submittal items, for compatibility comply with the requirements specified for temporary lighting, <br /> with the design of the building. heat or power in the ICC Electrical Code. <br /> Where structural observation is required by Section 107.4 Termination of approval. The building official is <br /> � 1709,the statement of special inspections shall name the authorized to temunate such permit for a temporary structure <br /> individual or firms who are to perform structural obser- or use and to order the temporary stivcture or use to be discon- <br /> vation and describe the stages of construction at which tinued. - <br /> structural observation is to occur(see aiso duties speci- <br /> fied in Section 1704). <br /> 106.3.4.2 Deferred submittaLs.For the purposes of this SECTION 108 <br /> section,deferred submittals are defined as those portions FEES <br /> of the desia that are not submitted at the time of the 10$.1 Payment of fees. A permit shall not be valid until the <br /> application and that are to be submitted to the building fees prescribed by law have been paid,nor shall an amendment <br /> official within a specified period. to a pernut be released until the additional fee,if any,has been <br /> Deferral of any submittal items shall have the prior p�d' <br /> approval of the building o�cial. The registered desion 108.2 Schedule of permit fees.On buildings,structures,elec- <br /> professionai in responsible charge shall list the deferred trical, �as, mechanical, and plumbing systems or alterations <br /> submittals on the construction documents for review by requiring a permit, a fee for each pernut shall be paid as <br /> the building official. required,in accordance with the schedule as es[ablished by the <br /> Documents for deferred submittal items shall be sub- applicable governing auihority. <br /> mitted to the registered desia professional in responsi- 108.3 Building permit valuations.The applicant for a permit <br /> ble charge who shall review them and forward them to shall provide an estimated permit value at time of application. <br /> the building official with a notation indicating that the Permit valuations shall include total value of work, including <br /> deferred submittal documents have been reviewed and materials and labor,for which the permit is being issued,such <br /> been found to be in general conformance to the desib of as electrical,oas,mechanical,plumbing equipment and perma- <br /> the building. The deferred submittal items shall not be nent systems.If,in the opuuon of the building official,the valu- <br /> installed until the design and submittai documents have ation is underestimated on the application,the permit shall be <br /> been approved by the building official. denied, unless the applicant can show detailed estimates to <br /> 106.4 Amended construction documents. Work shall be meet the approval of the buildin�official.Final building pernut <br /> installed in accordance with the approved construction docu- valuation shall be set by the building official. <br /> ments, and any chan�es made durin;construction that are not 108.4 Work commencing before permit issuance.Any person <br /> in compliance with the approved construction documents shall who commences any work on a building, structure, e]ectrical, <br /> be resubmitted for approval as an amended set of construction gas,mechanical or plumbing system before obtaining the neces- <br /> documents. sary permits shall be subject to a fee established by the building <br /> 1065 Retention of constructron documents. One set of official that shall be in addition to the required pernut fees. <br /> approved construction documents shall be retained by the 1085 Related fees.The payment of the fee for the construc- <br /> building of��€e��period of not less than 180 days from date tion, alteration, removal or demolition for work done in <br /> / <br /> 6 <br /> 2006 INTcRNATiONAL BUILDING CODE� <br />
The URL can be used to link to this page
Your browser does not support the video tag.