Laserfiche WebLink
. + <br /> CTTY OF ORONO SEPTICSYSTEI�IPERi`�IITAPPLICATTON <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, I��t �5323 :` `� `� ��►d�U <br /> � �,;,- . -�E;.,'�� - <br /> J <br /> JOB SIT'E ADDRESS: � I � J /�-s;r°��r.�+G �- �i�4� <br /> Occupanc`• Type: Residential �`'� Commercial Other <br /> Permit T�•pe: iVresv or Replacement S3'stem, $100.00 L..� <br /> Repair Existing System, � 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> , �`See fee schedule for non-residential permit fees <br /> Otimer's I�Tame: ��-� /��.c-j r �. Phone Number: j�'� ~ �`l�y`� <br /> I�Iailing Address: 0 t� f"1,' _ r� City: �Tl���,t.l��.�%:�� �� S�`3�� <br /> � � Phone I\'umber: ��Z Y���� <br /> � Contractor's I�rame: � ..�=� � �'t�'�%J% %�� <br /> I1�Iailing Address: �..� �o:� r o �l -� ���p- City: �o�.-�t�� �P�-���� <br /> DO NOT 1�SAII, PAI'i�'IENT ti�I�TH THIS APPLICATIO�' <br /> GEtirERAL .�'STRUCTIONS <br /> 1. Applicacions for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permics will not be mailed out. The permit mus[ be picked up in <br /> person at the Ciry Offices and work must not be�in unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holdin� a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system desi;n. Desi�n <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the City Inspector. <br /> 4, The followin� inspections will be required for all septic systems: <br /> A. Pre-inst.allation site inspection to include inspector, installer, and general con[ractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to coverin�. For mounds, inspeetion is required <br /> afrer rouQh-up bu[ prior to sand placemen[ (sand will be jar tested for silt content), <br /> and a�ain durin� pressure distribution pipin; installation in the rock bed. <br /> D. Fi.nal inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present durin� inspections: A 24- <br /> hour notice is required for all inspections. <br />